Laserfiche WebLink
PERMIT, PART I <br />Page lq of 13 <br />Permit No. CO-0034142 <br />C. STORMWATER REQUIREMENTS <br />The amual repoR will be due to the Division on or before February IS of each year. The exact due date for the <br />permittce's first amual report will be listed in their permit certificatign. In no case: will an amual repoR be due <br />before February 15, 1994, unless specifically directed by the Division. The Division reserves the right to require <br />additional information is the repoR, on a case-by-case basis, as needed. <br />All stormwaler reports required for submittal shall be signed and certified for accuracy by the permittee. (See Pan <br />I.C.10 of the permit.) <br />9. Monitorine <br />The Division reserves the right to require sampling and testing, on a case-by-case basis, in the event that there is reason to <br />suspect that compliance with the SWMP is a problem, or to measure the effectiveness o:F the BMPs in removing pollutants <br />in the effluent. <br />10. Si¢rratory Requirements <br />a) All reports required for submittal shall be signed and ceRified for accuracy by the permittce in accordance with the <br />fallowing criteria: <br />i. In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her <br />duly authorized representative, if such representative is responsible for the overall operation of the facility from <br />which the discharge described in the form originates; <br />ii. In the case of a paRnership, by a general partner; <br />iii. In the case of a sole proprietorship, by the proprietor; <br />iv. In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected <br />official, or other duly authorized employee. .. <br />b) Changes to authorization. If an authorization under paragraph a) of this section is no longer accurate because a <br />different individual or position bas responsibility far the overall operation of the facility, a new authorization <br />satisfying the requirements of paragraph a) of this section must be submitted to the Division, prior to or together with <br />any reports, information, or applications to be signed by an authorized representative. <br />c) Certification. Any person signing a document under paragraph a) of this section ::hall make the following <br />certification: <br />"I certify under penalty of law that this document and all attachments were prepared under my direction or <br />supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate <br />the information submitted. Based on my inquiry of the person or persons who manage the system, or those <br />persons directly responsible for gatltering, the information submitted is, to the best of my knowledge and belief, <br />true, accurate, and complete. I am aware that there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations." <br />1 I. Additional Requirements for Stormwater Discharee Associated with Other Industrial Ae;tivities <br />This permit may only authorize a stortnwater discharge associated with another regulated industrial activity located at a <br />mine site that is mixed with a stormwater discharge from a mine site where: <br />