Laserfiche WebLink
<br />Cripple Creek 8 Victor Gold Mining Company <br />Pond Water Usage for Dust Supression <br />Fourth Quarter 1999 <br /> <br /> <br />DATE LOAD <br />COUNT TRUCK <br />CAPACITY POND 4A <br />GALLONS POND 4C <br />GALLONS POND 6 <br />GALLONS LOCATION <br />USED <br />10/12/1999 6 13,000 78,000 Haul Roads/•OSATR <br />10/15/1999 5 13,000 65,000 Haul Roads <br />10/23/1999 7 13,000 91,000 Haul Roads <br />10/24/1999 4 13,000 52,000 Haul Roads <br />10/25/1999 2 13,000 26,000 Haul Roads <br />10/25/1999 2 18,000 36,000 Haul Roads <br />10/26/1999 7 18,000 126,000 Haul Roads <br />10/26/1999 7 13,000 91,000 Haul Roads <br />10/27/1999 3 13,000 39,000 Haul Roads <br />10/27/1999 8 18,000 144,000 Haul Roads <br />10/28/1999 7 13,000 91,000 Haul Roads <br />10/29/1999 12 13,000 156,000 Haul Roads <br />10/30/1999 9 13,000 117,000 Haul Roads <br />11/08/1999 7 13,000 91,000 Haul Roads/*OSATR <br />I I/l 1/1999 6 13,000 78,000 Haul Roads/•OSATR <br />l 1/12/1999 7 13,000 91,000 Haul Roads/•OSATR <br />11/12/1999 9 18,000 162,000 Haul Roads/^OSATR <br />11/13/1999 6 13,000 78,000 Haul Roads/•OSATR <br />11/14/1999 5 13,000 65,000 Haul Roads/•OSATR <br />l 1/14/1999 9 18,000 162,000 Haul Roads/•OSATR <br />11/16/1999 3 13,000 39,000 Haul Roads/*OSATR <br />11/17/1999 5 13,000 65,000 Haul Roads/•OSATR <br />11/17/1999 4 18,000 72,000 Haul Roads/•OSATR <br />11/19/1999 13 13,000 169,000 Haul Roads/•OSATR <br />11/20/1999 4 18,000 72,000 Haul Roads/•OSATR <br />11/21/1999 4 13,000 52,000 Haul Roads/•OSATR <br />TOTALS 2,308,000 <br />•OSATR= overburden storage area travel routes <br />••No water was used from I (/21/99 through 12/31/99 <br />02/04/2000 <br />