Laserfiche WebLink
L--. %vae"', <br />•� �, dot *��I <br />fir,, ����► �{' ♦ O�`r �� <br />.r. <br />7 � <br />, <br />Ff <br />s� 7 <br />16 15 _ <br />21 122 <br />LAND OWNER MAY MAINTAIN <br />LIVESTOCK OPERATIONS 50 <br />LONG AS FEASIBLE <br />DEWATERING TRENCH (AS NEEDED) <br />MINE TO NEAR VERTICAL SLOPES TO <br />OPTIMIZE RESOURCE RECOVERY <br />SIDE SLOPES SUBJECT TO CONCURRENT <br />RECLAMATION (SEE NOTES) <br />PIT FLOOR AT APPROX. 25' DEPTH <br />— L <br />NOTES: <br />1. CONCURRENT RECLAMATION WILL OCCUR AS OVERBURDEN MATERIALS ARE <br />MOVED FROM FUTURE MINING AREAS. THE OPERATOR MAY REPLACE MATERIAL <br />IN SIDE SLOPE OR IN LIFTS TO OTHER FINAL GRADING, AS INDICATED ON <br />EXHIBIT F. <br />2. THE OPERATOR MAY MINE TO FINISHED SLOPES OR REPLACE OVERBURDEN IN <br />TEMPORARY BACKFLl FEATURES, CONTAINMENT FOR SILTATION PONDS AND <br />OTHER WATER MANAGEMENT FEATURES. <br />TYPICAL EXCAVATION SIDE SLOPE <br />NOT TO SCALE <br />SEED SEED <br />6" TRENCH TO <br />COLLECT SEDIMENT <br />NOTE: A SUFFICIENT QUANTITY OF TOPSOIL <br />SHALL BE STOCKPILED TO ACHIEVE FINAL <br />RECLAMATION, AS SHOWN ON EXHIBIT F, <br />WITH 6- INCHES OF TOPSOIL ON ALL <br />RECLAIMED LAND SURFACE AREAS. <br />OVERBURDEN / TOPSOIL STOCKPILES DETAIL <br />NOT TO SCALE <br />666 i <br />GRAPHIC SCALE <br />500 0 250 500 1000 <br />6 5YA 4 03.6 (IN FEET) <br />x A finch =500 ft. <br />CONTOUR INTERVAL =5' <br />11 <br />5297 FRESHWATER POND <br />(APPROX.5 ACRES) <br />(SEE NOTE 7) <br />529] <br />" 956 <br />" <br />1 <br />x52971 �` x K`.:93.4 <br />1 <br />52 <br />5295.6 � <br />h: <br />FLOODPLAIN MINING SUBJECT TO <br />APPROPRIATE APPROVALS <br />MAJ OWN <br />low, M <br />v< \e a <br />RECOVERY OF CONSTRUCTION <br />MATERIALS TO NEAR- VERTICAL <br />SLOPES (SEE DETAIL) <br />x5286 a <br />0 <br />a <br />— x5/3? 0 <br />I <br />�t <br />\ <br />SECTION LINE <br />PERMIT BOUNDARY <br />EASEMENT/ R.O.W. <br />MINING LIMITS <br />°� <br />3e�o <br />UNPAVED ROAD <br />"a <br />U <br />ry •„` <br />RAILROAD <br />. r <br />FENCE <br />— OW— oHU— oHU- OHU— oHU- <br />OVERHEAD POWER LINE <br />— w — w — w — w — w — <br />UNDERGROUND WATERLINE <br />UNDERGROUND UTILITY LINE <br />— GA$ — GA5 — 6A5 — GAS— GA$ — <br />P�'.Ku <br />NOW <br />DITCH / WATERWAY <br />EXISTING INDEX CONTOUR <br />- <br />EXISTING INTERMEDIATE CONTOUR <br />PROPOSED INDEX MINING CONTOUR <br />PROPOSED INTERMEDIATE MINING CONTOUR <br />1 52846 <br />EXISTING STRUCTURE <br />EXISTING WATER WELL <br />rlrllCLi���i % ' <br />ACCESS EASEMENT <br />���y! • <br />100-YR FLOODPLAIN <br />5"30 <br />.5283.0 <br />JURISDICTIONAL WETLANDS <br />SEED SEED <br />6" TRENCH TO <br />COLLECT SEDIMENT <br />NOTE: A SUFFICIENT QUANTITY OF TOPSOIL <br />SHALL BE STOCKPILED TO ACHIEVE FINAL <br />RECLAMATION, AS SHOWN ON EXHIBIT F, <br />WITH 6- INCHES OF TOPSOIL ON ALL <br />RECLAIMED LAND SURFACE AREAS. <br />OVERBURDEN / TOPSOIL STOCKPILES DETAIL <br />NOT TO SCALE <br />666 i <br />GRAPHIC SCALE <br />500 0 250 500 1000 <br />6 5YA 4 03.6 (IN FEET) <br />x A finch =500 ft. <br />CONTOUR INTERVAL =5' <br />11 <br />5297 FRESHWATER POND <br />(APPROX.5 ACRES) <br />(SEE NOTE 7) <br />529] <br />" 956 <br />" <br />1 <br />x52971 �` x K`.:93.4 <br />1 <br />52 <br />5295.6 � <br />h: <br />FLOODPLAIN MINING SUBJECT TO <br />APPROPRIATE APPROVALS <br />MAJ OWN <br />low, M <br />v< \e a <br />RECOVERY OF CONSTRUCTION <br />MATERIALS TO NEAR- VERTICAL <br />SLOPES (SEE DETAIL) <br />x5286 a <br />0 <br />a <br />— x5/3? 0 <br />I <br />�t <br />\ <br />\ \ \\ <br />10 \ <br />\ <br />\ <br />o \\ <br />- 0HU— CHU— ®HU <br />\ \ \\ T, <br />5IJ 3 9/ <br />N I <br />EMERGENCY ACCESSRO \ �� <br />(OLD PUEBLO ROAD) \'\ \ <br />111 <br />LEGEND <br />SECTION LINE <br />PERMIT BOUNDARY <br />EASEMENT/ R.O.W. <br />MINING LIMITS <br />PAVED ROAD <br />----------------------- - - - - -- <br />UNPAVED ROAD <br />PROPOSED ACCESS <br />ii (Ii111111111i1i1111111111ii1iii <br />RAILROAD <br />. r <br />FENCE <br />— OW— oHU— oHU- OHU— oHU- <br />OVERHEAD POWER LINE <br />— w — w — w — w — w — <br />UNDERGROUND WATERLINE <br />UNDERGROUND UTILITY LINE <br />— GA$ — GA5 — 6A5 — GAS— GA$ — <br />UNDERGROUND GAS LINE <br />NOW <br />DITCH / WATERWAY <br />EXISTING INDEX CONTOUR <br />- <br />EXISTING INTERMEDIATE CONTOUR <br />PROPOSED INDEX MINING CONTOUR <br />PROPOSED INTERMEDIATE MINING CONTOUR <br />1 52846 <br />EXISTING STRUCTURE <br />EXISTING WATER WELL <br />rlrllCLi���i % ' <br />ACCESS EASEMENT <br />���y! • <br />100-YR FLOODPLAIN <br />5"30 <br />.5283.0 <br />JURISDICTIONAL WETLANDS <br />' <br />�',�. , a?" <br />1 <br />\ \ \\ <br />10 \ <br />\ <br />\ <br />o \\ <br />- 0HU— CHU— ®HU <br />\ \ \\ T, <br />5IJ 3 9/ <br />N I <br />EMERGENCY ACCESSRO \ �� <br />(OLD PUEBLO ROAD) \'\ \ <br />111 <br />LEGEND <br />SECTION LINE <br />PERMIT BOUNDARY <br />EASEMENT/ R.O.W. <br />MINING LIMITS <br />PAVED ROAD <br />----------------------- - - - - -- <br />UNPAVED ROAD <br />PROPOSED ACCESS <br />ii (Ii111111111i1i1111111111ii1iii <br />RAILROAD <br />FENCE <br />— OW— oHU— oHU- OHU— oHU- <br />OVERHEAD POWER LINE <br />— w — w — w — w — w — <br />UNDERGROUND WATERLINE <br />UNDERGROUND UTILITY LINE <br />— GA$ — GA5 — 6A5 — GAS— GA$ — <br />UNDERGROUND GAS LINE <br />— — — — — - <br />DITCH / WATERWAY <br />EXISTING INDEX CONTOUR <br />- <br />EXISTING INTERMEDIATE CONTOUR <br />PROPOSED INDEX MINING CONTOUR <br />PROPOSED INTERMEDIATE MINING CONTOUR <br />O <br />EXISTING STRUCTURE <br />EXISTING WATER WELL <br />rlrllCLi���i % ' <br />ACCESS EASEMENT <br />���y! • <br />100-YR FLOODPLAIN <br />JURISDICTIONAL WETLANDS <br />2831 I / o <br />52736 /i (198.5 ES) X52620 \ 52 <br />„ ACCESS ROAD AND CONVEYOR <br />(SEE NOTE 6) <br />Sze <br />\` 5 lY ,526ea <br />2 <br />1 .52669 I <br />, \ n <br />i <br />1 I •4 <br />WETLAND AVOIDANCE — — <br />25'BUFFER <br />(SEE NOTE 5) <br />x�z %7.a <br />526[,9 <br />\\ •52642 ' <br />s� a <br />1 <br />\ 5L686 <br />268.3 : -.258 r'' 57574 i <br />\ \ � •5259.4 __ ��"'� <br />/��` � OWTp -ONU U -0141 ]HU UIU -OMU pRl.- OHU�OFA, <br />5248.9 <br />^v A� PHASE It B "5247 <br />(43.1 ACR S) <br />\ <br />�5 <br />220' 24e.1 (` 1 <br />5298.0 �' -- <br />"52624/ - <br />, r <br />I _ <br />\ <br />\ <br />v 525< I ' <br />,9 / v 1 ,41 <br />\ fir <br />4 4 , IV <br />52531 <br />�{ \ 256.; =zsv <br />52520' '\ <br />\ 20 <br />514;; i <br />59 1 <br />GENERAL NOTES: <br />1. BASE INFORMATION TAKEN FROM TOPOGRAPHICAL SURVEY <br />OF THE SUNDANCE PROPERTIES BY OBERI%, WURTH d <br />ASSOCIATES, DATED FEB. 12, 2006 AND REVISED JUNE 28, <br />2006. <br />2. FLOODPLAININFORMATION SHOWN FROM FLOOD <br />INSURANCE RATE MAPS FIRM PANEL NUMBERS; 08041CII60 F, <br />0804101170 F, DBD41CII80 F AND 0804161190 F, ALL WITH AN <br />EFFECTIVE DATE OF MARCH 17,1997. BASE FLOOD <br />ELEVATIONS NOT SHOWN. ZONES A AND AE ARE REGULATED <br />BY EL PASO COUNTY, COLORADO. ZONE X I5 NOT REGULATED. <br />3. OIL / GAS WELL LOCATION FROM COLORADO OIL AND GAS <br />CONSERVATION COMMISSION GIS WEBSITE. <br />4. TEMPORARY NATIVE GRASS SEED MIXTURE WILL BE USED AS <br />A COVER CROP FOR ALL STOCKPILES TO REMAIN IN PLACE FOR <br />ONE YEAR OR LONGER. <br />5. WETLAND BUFFERS. THE OPERATOR WILL AVOID IMPACTS TO <br />EXISTING WETLANDS. AS ILLUSTRATED, A SETBACK OF AT <br />LEAST 25 FEET WILL BE MAINTAINED BETWEEN ALL MINING <br />RELATED ACTIVITIES AND JURISDICTIONAL WETLANDS. <br />6. ACCESS ROAD AND CONVEYOR. THE OPERATOR WILL <br />MAINTAIN AN ACCESS ROAD AND CONVEYOR EQUIPMENT <br />THROUGH THE APPROXIMATE CENTER OF THE MINED AREAS. <br />ALIGNMENT MAY BE ADJUSTED AS MINING PROCEEDS TO <br />ACCOUNT FOR VARIOUS MINING AND RECLAMATION <br />ACTIVITIES. <br />7. FRESHWATER POND. ALL STORMWATER FROM DISTURBED <br />AREAS WILL BE DIRECTED TO THE FRESHWATER POND FOR <br />DETENTION AND WATER QUALM PURPOSES. THE <br />FRESHWATER POND WILL ALSO CONTAIN ADEQUATE VOLUME <br />TO STORE AND CLARIFY DEWATERING WATER PRIOR TO <br />DISCHARGE. <br />8. DEWATERING PROCESS. TRENCHES OR PIPES WILL BE USED TO <br />CONVEY PUMPED WATER TO THE FRESHWATER POND FOR <br />CLARIFICATION, THEN CONSUMPTIVE USE OR DISCHARGE. ALL <br />DEPLETION OF GROUNDWATER WILL BE ACCOUNTED FOR BY A <br />PLAN OF AUGMENTATION OR SUBSTITUTE WATER SUPPLY, <br />9. THE OPERATOR WILL STRIP AND STOCKPILE TOPSOIL AND <br />OVERBURDEN FROM THE PROCESSING AREA PRIOR TO THE <br />COMMENCEMENT OF MINING. RECOVERY OF MATERIAL <br />WITHIN THE FOOTPRINT OF THE FRESHWATER POND WILL <br />THEN TAKE PLACE, WITH SOME OVERBURDEN TO BE <br />BACKFILLED TO ACHIEVE FUNCTIONAL GRADING WITH THE <br />FRESHWATER POND. <br />PREPARED BY: <br />BANKS AND GESSO, LLC. <br />■■ 720 KIPLING ST., SUITE 117 <br />LAKEWOOD, COLORADO 80215 <br />(303) 274 -4277 <br />JOB NO DATE <br />06015 9/25/06 <br />RECEIVED <br />OCT 0 2 2006 <br />Division of Reclamation, <br />Mining and Safety <br />PREPARED UNDER THE SUPERVISION OF: <br />-T 1"jf7r `,- <br />TITLE <br />EXHIBIT C -2: MINE PLAN MAP <br />APPLICANT: PROJECT: <br />LAFARGE, NORTH AMERICA SUNDANCE <br />10170 CHURCH RANCH WAY, SUITE 200 SAND AND GRAVEL RESOURCE <br />WESTMINSTER, CO 80021 EL PASO COUNTY <br />FOUNTAIN, CO <br />SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEE <br />1" =500' DRF <br />