Laserfiche WebLink
<br /> <br />ESTIMATING FORM - RE VEGETAT ION WORK cont'd <br /> <br />Filename M109-] sheet 2 of 2 <br />.~ B. a HRUB 4 TREE TRANSPLANTS <br />-~-" ______________•_____________ ~ ~ MATERIAL~~ PLANTING: ~ S/FE RT. ~ TOTAL ~ TOTAL <br />~ SPECIES NAME I QUAN./ACRE I STOCK TYPE 6 SIEE ~ 5/PLANT ~ 5/PLANE ~ PELLET ~ S/PLANT ~ 5/ACRE <br />No cra nsp La nts [equi cedl ~ <br />I ~ ~ ~ <br />~ ~ ~ ~ 50.00 <br /> <br />~ <br />~ ~ ~ <br />~ ~ <br />~ <br />Total ~ <br />~ <br /> <br />transplant I <br /> <br /> <br />cost/acre: <br /> <br /> <br />0.00 <br />C. SEEDBED PREPARATION <br />tilling method qi: No seedbed preparation work required <br />q2: <br />D. SEED APPLICATION <br />Seeding method: broadcast seeding ('97 contr. tlacal <br />E. FERTILIZING <br />••••_••_-+..... FERTILIZER / SOIL AMENDMENT <br />Mate ria is used pl: 8-24 -24, 10-15-15, 10-20-20 <br />p2: <br />pl: <br />Application method pl: tractor drawn broadcast spreader •• <br />p2: <br />521.'11 <br />Total application cos c/acre: 521.71 <br />F. MULCHING <br /> MULCH / NETTING / OTHER MATERIALS I UNITS/ACRE ~ UNIT ~ S/UNIT ~ 5/ACRE <br />Materials used pl: hay (delivered) - ton ~ 2.00 ~ ton 15110.'/5 I 5221.49 <br />p2: I I I I <br />p3: I ~ ~ ~ <br />q9: ~ ~ ~ ~ <br /> Total materials cos c/acre: 5221.49 <br />Application method pl: crimping (v rth tractor) 597.00 <br />p2: <br />ql: <br />Total application cost/acre: 593.00 <br />G. JOB COST =_ _______ ••_ <br />Total are a•[o be seeded: 1.20 acres. Total 5/acre 564"!.79 Total Initial Sob Cos[= 5]]6. 9] <br />Esc ima[ed failure race: 25'OOt of area. focal 5/ac re• $751.83 Total Reseeding Costs •• •$105? 55 <br /> ___ __ Reseeding cost stems: A D GRAND TOTAL JOB COST = 5882 .92 <br />50.00 <br />Toca1 cost/acre: 50 .00 <br />Total cos c/acre: _ __ $155 ']6 <br />UNITS/ACRE ~ UNIT I $/UNIT I 5/ACRE <br />.._______~____........I.......... ~.........~ ............. <br />I 50.00 ~ pound ~ $0.19 ~ 59.75 <br />I <br />I I <br />.........~............I........._~...._._..~ ............. <br />Total materials cost/acre: 59.35 <br />