Laserfiche WebLink
BASIN RESOURCES, INC. - <br />SEDIMENTATION POND INSPECTION FORM <br />Pond GOLDEN EACLE SAE 11 b 1]A NPDES NO. ']pNTAIQItgENT. DITCH <br />Date of Inspecti <br />~. <br />JG~/f <br />EMBANKMENT -- <br />1. Adequacy of the vegetative cover: xcelle Modernte, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Very Few, None <br />3. Ia wave action causing erosion: <br />On the upstream embankment? Yea No <br />• At the principal spillway inlet? Yee No <br />4. Erosion of the downstream toe of the embankment? Yea No~ <br />The cause of the erosion is attributed to: <br />5. Ia seepage occurring through the dnm7 Yea No ~( If yes <br />could thls seepage cause potential inatnbility? Yea No~_ <br />Explain: <br />PRINCIPAL SPILLUAY ^/ p~/'~ . <br />1. Is the principnl spillway system in working order't Yea No <br />2. Is the inlet free of debris and restrictive mater:Lal?Yea No <br />~o./ <br />~"'_ 3. Ia the discharge outlet ree of restrictive mnter:lnl? Yea No_ <br />~o/[ <br />4. Is erosion occurring at the discharge outlet? Yeas No If <br />yes, <br />,; evaluate the severity: Extensive Moderate Just starting on <br />'f <br />EMERGENCY SPILLMAY <br />1. Is the overall <br />design storm d <br />2. Does it appear <br />since the last <br />~/p•/ t ' <br />emergency spillway system capable of passing <br />Lacharge? Yes No <br />as if the emergency'spillway has ciiacharged water <br />inspections?~ Yea~~No <br />3. Is erosion occurring at asiy section of the emergency spillway? <br />Yes No Describe the <br />extent . <br />EEDINENT STORAGE CAPACITY ~ pi{!~ <br />1. Hae the design storage cnpacity of the reservoir been surpassed? <br />Yea No If yea, <br />explain: <br />~~:~_w.' Please add nny special comments} concerning potentially dangerous <br />problama on the back of this sheet. / <br />Inspector ~^ <br />s <br />