The material excavated from the site and placed in the Equipment Storage area will be returned to the site. It is <br />anticipated the material will be dozed back to the site and sloped to conform with the approved post mining <br />• topography. The plant growth material will be returned to the site and seeded. <br />The fan and power poles will be removed from the property and placed in the appropriate landfill. <br />Preparation Plant Powerline <br />When the preparation plant powerline is no longer needed, it will be dismantled and removed from the site. <br />Preparation Plant Waterline <br />When the preparation plant waterline is no longer needed, the surface portion of the waterline, pumphouse and <br />power line will be dismantled and removed from the site. <br />Preparation Plant Building, Thickener Tank and Refuse Bin <br />When the structures are no longer required they will be dismantled and either removed from the site or crushed and <br />buried in the portal area. It is anticipated that the later option will be exercised unless the building material can be <br />salvaged and recycled. The piers associated with the structures will be excavated to three feet below final grade, <br />removed and placed in the pit and covered during the backfilling of the pit. The reclamation bond addressed the <br />worst case of demolishing the building and removing it from the site. <br />Batch Weigh/loadout System <br />Reclamation of the batch weigh system coal stockpile area, conveyor areas and batch weigh/loadout building site will <br />• be accomplished according to the existing Reclamation Time Table (Table 52) in Permit C-82-056. All structures will <br />be removed from the site, with the exception of the reclaim tunnel. Concrete foundation materials will either be <br />disposed of in the reclaim tunnel or transported to the portal highwall cut and buried. That portion ofthe reclaim tunnel <br />which is above grade will be broken up. That portion of the reclaim tunnel which is below grade will have the roof <br />broken up to a depth of approximately three feet, the tunnel will be filled with the broken up tunnel materials and <br />overburden materials, and the tunnel will then be abandoned in place. <br />Reclamation of the batch weigh system coal stockpile site will involve reconfiguring the site in order to reestablish <br />premining contours. During construction of the batch weigh loadout system facilities, fill material may be removed <br />from the site for use in the realignment of CR 27. In order to reestablish premining contours, TCC will replace an <br />equivalent volume of material at the batch weigh loadout system site during final reclamation. The replacement <br />material will consist of spoil obtained during regrading operations in the area south of the existing portals and <br />associated facilities at the Foidel Creek Mine. The volume of replacement material potentially required (maximum <br />12,000 cubic yards) will have no discernible impact on the final regrade configuration proposed for the source area <br />described. After respreading the cover materials, topsoil will be respread. Calculations indicate that 2500 cubic yards <br />of topsoil salvaged from the site will be respread. The respread topsoil will be prepared for seeding and will be seeded <br />according to the approved reclamation plan for similar adjacent areas. Post-mining topography for the area will <br />approximate that shown on Volume 6 Map No. 31. <br />No. 7 North Escape Shaft <br />When the facility is no longer required, the hole will be plugged, the site graded, topsoiled, and revegetated. A number <br />of steps will be required to abandon the shaft. These include removal of surface structures, demolition of concrete <br />foundation and piers and sealing of shaft. After the surface structure is removed the broken up foundation and piers will <br />be put down the shaft. Upon completion of this work decking will be suspended in [he shaft 10 feet below grade. The <br />• support beams and decking will be suspended from the steel casing by steel straps (i.e. I-beams or similar support <br />TR 02- 40 2.05-105 2/19/02 <br />