Laserfiche WebLink
row.. w_+e PEABODY COAL COMPANY ~~~~~~ ~~ ~ ~ ~ ~ .~ ~ ~~ ~ ~ ~- <br />COMPANY MEMORANDUM ' <br />~. <br />D,4TE: October 12 , 1976 <br />TO: SEE BELOW .. <br />FROM: Fred W, Fest~ <br />Re: Seneca Topsoil Area <br />Mark Heffner of the Department of Reclamation Staff, discussed <br />the issue of how far back we had to topsoil, with his superior, <br />Gilbert Rindahl, Director of Mined Land Reclamation. It was <br />determined by them that the boundary should be a May 21, 1976 <br />line. This date was the permit approval date. We should locate <br />i a line in the field corresponding to the May 1, 1976 date to begin <br />our topsoiling. <br />FWF:jo <br />TO: L. E. Benson <br />Frank Gilbert <br />A. F. Grandt <br />J. F. Lake <br />R. Schroeder <br />L. G. Shearer <br />V. Staley <br />D. R. Sturges <br />File <br /> <br />9-9-7 Revised 06/16/97 i <br />