My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24226
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:23 PM
Creation date
11/20/2007 4:30:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Hydrology
Doc Date
3/28/2001
Doc Name
1st Qtr 2001 Inspections\
From
RONALD G THOMPSON
To
ENERGY FUELS COAL INC
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1(11) and 4.10.2(2) <br />Mine: Southfield <br />Waste Bank MSHA ID. No.: Primary Refuse Disposal Area <br />Inspection Period: Fourth Quarter 2000 <br />Inspection Date: <br />November 10, 2000 <br />General Description or Reference to Site Plan: <br />The refuse area lies west of the main facilities area. Refuse has been placed in designed lifts <br />on a relatively flat terrain. Upslope runoff is diverted away from the disposal area, while runoff from <br />the disposal area is channeled to a sediment control pond. A majority of the disposal area has <br />been reclaimetl and exhibits good vegetative growth. <br />Activity During inspection: <br />Area was idle during the inspection. Topsoil that had been placed in temporary stockpile storage <br />during the previous quarter, had been spread on the area of contemporaneous reclamation <br />as required by approved permit designs. Refuse is now being placed in the new expansion area <br />on the west edge of the existing refuse disposal area. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/ <br />or discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />No springs or seeps were observed on the refuse side slopes. Positive drainage is established on <br />all reclaimed areas. Good vegetation has been established on reclaimed areas with only minor <br />rilling in some more sparsely vegetated areas. Drainage and diversion structures were intact; All <br />underdrain construction has been completed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Plant wad idle during the inspection with no refuse placement. Evidence of waste placement in <br />alternating lifts of fin8 and coarse material was evident. Placement was in accordance with the plan <br />as described in the TerraMatrix report of December 9, 1996. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.