Laserfiche WebLink
Blue Mountain Energy, Inc. - Deserado Mine <br />Quarterly Sediment Pond Inspection Report <br />Third Quarter 1999 <br />Inspector: Scott Wanstedt -Environmental Engineer <br />Operational Status <br /> <br />^ Type of Approx Sediment Oul tlow H:O Samp. <br /># Ponds Name Description Date H:0 Level % Level °,o Yes No Yes No Comments <br />I Sed Ponds DP-I D-Portal 9/29 95 35 X X discharged and sampled earlier in quaver <br />2 RP-I Refuse Area I 9/29 0 10 X X <br />3 RP-2/3 Refuse Area 2/3 929 5 2 X X <br />4 RP-A Refuse Area 4 9/29 10 2 X X <br />5 RP-5 Refuse Area SA 9/30 10 10 X X <br />6 RR-I Railroad Fill Slope Pond I 9/30 0 5 X X <br />7 RR-2 Railroad Fill Slope Pond 2 9/30 0 5 X X <br />8 RR-3 Railroad Loop Pond 9/30 0 10 X X <br />9 SS-I Slot Storage Building Access Road Pond 9/30 0 10 X X <br />10 SS-2 Slot Storage Blding Emergency Coal Storage Area Pond 9/30 0 5 X X <br />I I HSL-I Halandras Sanitary Land Fill Pond 9/30 0 5 X X <br />12 SDH-2U Down Hole Sump Upper InOuem Pond 9/30 inactive 5 X X Shut off 2/96 due to mine sealing <br />13 SDH-2L Down Hole Sump Lower E(Fluent Pond 9/30 inactive 5 X X Shut oft 2/96 due [o mine sealing <br />14 SDH-3/5 Down Hule Sump Discharge 2 9/30 inactive 10 X X Shw o(f 2/96 due to mine staling <br />IS EP-I East Portal 9/29 0 5 X X <br />16 Sumps RRS-I Railroad Sump I 9/30 0 5 X X <br />17 TS-I Transfer building I 9/30 0 5 X X <br />18 ~fS-2 Transfer Building 2 9/30 0 10 X X <br />19 EP-2 East Laydown Pad 9/29 I 5 X X <br />20 EP-3 West Laydown Pad 9/29 0 5 X X <br />21 EP-4 Turnaround Pad 9/29 0 5 X X <br />22 Proc Pond PP-I Prep Plant Proccess Pond 9/30 20 45 X X <br />23 PP-2 Prep Plant Process Pond 9/30 IS 35 X X <br />2a <br />