Laserfiche WebLink
~~r-tM r ~' /- r ~ P <br />~ Fle~,ti~ dl~~e~~~ <br />Roger Fleming <br />PO Box 1282 <br />Montrose, CO 81402 <br />July 17, 2003 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO ~ 03 / <br />RE: Haldorson Sand and Gravel Mine, File No. M-200/3-037 <br />Sirs: <br />RECEIVED <br />JUL 2 1 ZtL3 / <br />Division ~f Minerals and Geology <br />Please require Haldorson and Sons, Inc. to provide a thorough ground water assessment <br />done by a qualified hydrologic agency before issuing a permit. At a recent meeting with <br />the Montrose Planning Commission it came to light that a water study had not been <br />accomplished. There are concerns over springs adjacent and downstream as well as <br />potential impact on adjudicated water rights. <br />The hydrologic study should include a sufficient number of monitoring wells on the <br />perimeter of the property at a depth of the proposed mining operation. Because of the <br />nature of ground water flows in the Spring Creek area these well should be evaluated on a <br />weekly basis over a period of one year. <br />This study should provide evidence that the proposed project will not alter or impact <br />historic water rights or the ten decreed springs that exist directly east and downstream of <br />the deepest part of the mine. <br />The study must ensure against contamination of ground water and surface water from any <br />source. To ensure effective study results the applicant should be required to establish a <br />baseline of information of the current air and water quality so future air and water quality <br />standazd can be reasonably enforced during the life of the mine. <br />The current application statements are inadequately supported. Haldorson and Sons, Inc. <br />says it will restore the mine for cropland. A pit 40 feet deep, neazly one mile long and <br />1000 feet wide with a high water table will be wholly unsuitable for cropland. Therefore <br />it is requested that Haldorson and Sons, Inc. be required to reclaim the land as cropland to <br />a depth of not more than ten feet below the present level of the land or two feet above the <br />highest ground water recorded during the hydrologic testing period. It is also requested <br />that all test results be made public including those on which claims of gravel deposits, <br />overburden, topsoil and no ground water aze based. <br />