My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55161
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:05 PM
Creation date
11/20/2007 4:28:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000077
IBM Index Class Name
Permit File
Doc Date
9/13/2000
Doc Name
PN M-2000-077 ADEQUACY CONCERNS
From
DMG
To
PK ENTERPRISES INC
Section_Exhibit Name
EXHIBIT A-LEGAL DESCRIPTION ADEQUATE - EXHIBIT B-ADEQUATE - EXHIBIT C - EXHIBIT D
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />Agency or organ¢ation name t OMG <br /> <br />Task # : 001 State :Colorado Permit(obp : M-2000-077 <br />Date: 09/t,Y2000 Counry:Teller Abbreviation :none <br />User: BMK Site:Mueller Stale Park Filename:M077-001 <br />Permit or other lob action :NEW PERMIT <br /> <br />Task description :GRADE SITE TO 2:1 <br />HOURLY EQUIPMENT COST Basic machine :Cat DBN (1996) Horsepower: 285 <br />Blade type 'Universal <br />AHachment no 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank upper <br /> <br /> Utilization % Cost data source : (GRG) <br />Cost Breakdown : Ownership cosl/haur : $d 1.30 NA <br />Operating cosVhour : $55.90 700 <br />Ripper op. cosUhour : $3.d7 50 <br />Operator cost/hour ~ . $23.12 NA <br />Total unit cosVhour : $123.79 Total lleet cosVhour: $723.79 <br />MATERIAL O UANTRIES <br />Initial Swell <br />volume: 38,000 LCY factor <br />Source of quantity take-oN :2 <br />Source of est. swell )actor : NA <br />Loose <br />NA volume: 38,000 LCY <br />Average push distance: 250 feet <br />Unadjusted hourly production : a20 LCV/hr <br />Matenel consistency descdption <br />Compacted fill or embankmen( <br />Average push gradient : 5.00 °.° (neg) <br /> <br />Average sde altitude : 9,300 feet <br />Material weigh) : 3.300 Ibs/LCV <br />Material weight descnption <br />Decompose0 rock - 75°6 Rock. 25 °S Earth <br />JOB TIME AND COST <br />FIeel Size: / Dozers) <br />Unit cost: $0.768 /LCY <br /> Source <br />Operator skill : 0.75 (avg.) <br />Matedal consistency : 0.90 (Cal HB, <br />Dazing method : 7.10 (50 a sIJ <br />Visibility: 1.00 (avg) <br />Job efficiency: 0.83 (/sh~tt/da <br />Spoil pile : 0.80 (ssd-acJ <br />Push gratlient : 1 11 (Cat HB, <br />Altitude' 7.00 (Cat HB, <br />Matedal wetghl : 0.70 (Cal HB, <br />Blatle type : 7.00 (S or U) <br />Net correction : 0.38 <br />Adjustetl unit production : 161.08 LCV/hr <br />Adjusted fleet pmducnon : 161.08 LCY/hr <br />Total lob limo: 235.91 Hours <br />Total loD COSt: $29,203 <br />
The URL can be used to link to this page
Your browser does not support the video tag.