My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55146
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:04 PM
Creation date
11/20/2007 4:28:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986037
IBM Index Class Name
Permit File
Doc Date
3/20/1986
Doc Name
BLM PIT WEST OF OLATHE APPLICATION FOR DEVELOPEMENT AND EXTRACTION MINING PERMIT LIMITED IMPACT 110
Section_Exhibit Name
TABLE OF CONTENTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br />EXHIBIT "B" <br />MINING PLAN <br />' BLM PIT WEST OF OLATHE <br /> (A) Excavation will be done by the Division of Highways or their Contractor. <br /> (B) All soil overburden with existing vegetation will be removed from the <br /> area to be mined and stockpiled within the permitted area for use in <br />' reclaiming the disturbed areas. These stockpiles will be seeded. There <br /> is very little soil overburden in this area with depths ranging from <br /> 0" to a few inches. <br />' (C) i <br />Th <br />l <br />b <br />i <br />d i <br />dd <br />k <br />d <br />t <br />b <br />d <br /> a <br />e mater <br />to <br />e m <br />e <br />Da <br />ota san <br />s <br />one. <br />ne <br />s <br />e <br /> (D) The material will be mined from the east to the west. Some mined material <br />' will be stockpiled in the area. The amount of material mined each year <br /> will depend on the need for riprap in the area, an estimate would be less <br /> than 500 cu. yds. per year. <br />' <br /> (E) The mined area will be worked in such a manner that terraces about 100 ft. <br /> deep and 5 feet high will be left after excavation. The back slopes of the <br />' terraces will be 3:1. <br />' ~-- 100' --~{ 3:1 slope <br /> <br />' -~- <br />5' <br /> TYPICAL TERRACE <br /> CROSS SECTION <br />' <br />1 <br /> <br /> <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.