Laserfiche WebLink
<br />SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTP.OL INSTRUCTIONS IN THE ORDER PERFORMED <br /> (A STAR (•) AFT ER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH <br /> A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) <br />SECTION/ S TANDARD RAZN ANTEC MAIN PRECI FI TAT ION PEAK DISC HARGE <br />STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME - --------- RUNOFF ---------- --- -- ----- ------ - <br />ID O PERATION AREA ({ COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE <br /> (SQ MI) (HR) (HA) (IN) (HR) (IN) (FT) ( HR) (CFS) (CBM) <br />ALTERNA TE 1 STORM 1 <br /> <br />XSECTI ON 1 RUNOFF .23 2 2 .10 .0 2.40 24.00 1.10 --- 12 .33 105. 03 461 .4 <br />XSECTION 1 REACH .23 2 2 .10 .0 2.40 29.00 1.10 --- I2 .33 105. 03 461 .4 <br />XSECTION 1 RUNOFF .04 2 2 .10 .0 2.40 24.00 .98 --- 12 .09 24. 57 674 .9 <br />XSECTION 1 ADDHYD .26 2 2 .10 .0 2.40 24.00 1.08 --- 12 .28 116. 44 441 .0 <br />XSECTI ON 2 RUNOFF .03 2 2 .10 .0 2.40 24.00 .72 --- 12 .12 15. 65 459 .4 <br />XSECTION 2 ADDHYD .30 2 2 .10 .0 2.40 29.00 1.04 --- 12. 24 127. 91 429 .1 <br />XSECTI ON 3 RUNOFF .02 2 2 .10 .0 2.90 24.00 .82 --- 12 .21 9. 99 920 .6 <br />XSECTION 3 ADDHYD .32 2 2 .10 .0 2.40 24.00 1.03 --- 12 .24 137. 77 928 .0 <br />STRUCTURE 1 RESVOR .32 2 2 .10 .0 2.40 24.00 .25 5618.41 18 .50 6. 09 18 .9 <br />(Revised 12/00) Attachment 2.05.3(3) -10-53 <br />