Laserfiche WebLink
_ ~ <br />,, STATE C~ iiiiiiiiiiiiiiiiiii <br />CUw1~U0 <br />OFFICE OF THE STATE ENGINEER <br />i <br />i <br />Di <br />f W oc.co <br />~ <br />+ <br />v <br />s <br />on o <br />ater Resources ,~ __p _ <br />. <br />n <br />a~.Y~: ~ <br />`~ <br />Department of Natural Resources <br />1377 Sh <br />S <br />R „ <br />%~ <br />$ <br />~ I? r <br />erman <br />treet. <br />oom 818 ~ <br />. ~~~. <br />Denver, Colorado 80?O7 • reic <br />Phone 13071 866-7581 <br />FAY (3031 866-3589 <br />ef <br />Response to Reclamation Permit Application Consideration Governor <br /> tames $. Lnchhead <br /> E,ecume Dve<tor <br /> <br />DATE: August 6, 1997 Hal D. Simpson <br />Sta[e Ens~neer <br />TO: James C. Stevens, Senior Environmental Protection Specialist <br />CC: Division 2 Office; District 12 Water Commissioner RECEIVEQ <br />FROM: Heidi Frey, P.E. ~•%r- <br />RE: Parkdale Project Pit, File No. M-97-054. A()G ~ 6 ~99~ <br />Operator: Agile Stone Systems, Inc., Contact: Bill Fehr <br />(303) 741-2556 Division of Minerals a ~t,olc„ <br />Section 12, Twp 185, Rng 72W, 6th P.M., Fremont County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then obtain <br />a waiver of objection from all well owners with wells within 600 feet of the permit area or request a <br />hearing before the State Engineer. <br />® Other: The applicant anticipates pumping 30,000 gpd from a proposed well to be used within the <br />process. The applicant must obtain a well permit, and without an approved plan for augmentation, it <br />is unlikely that a permit can be approved. <br />COMMENTS: This office recommends that the proposed project not be approved until the applicant has <br />obtained a plan for augmentation or an approved substitute water supply plan to replace depletions caused by <br />the pumping of ground water from a well. <br />