My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE55100
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE55100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:02 PM
Creation date
11/20/2007 4:27:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/25/2003
Doc Name
pages 2.05-59 through 2.05-116
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.6 <br />Hubbard Creek and Terror Creek will be monitored quarterly at the <br />designated upstream and downstream monitoring locations shown on Map <br />9. Field parameters will be measured each quarter. A full suite sample from <br />List 1 will be obtained semi-annually during the second and fourth quarters. <br />Hubbard Creek and Terror Creek flow will be measured at the upstream and <br />downstream monitoring locations by the USGS. The stream gaging stations <br />are to be installed by the USGS during 2001 under a cooperative (cost <br />sharing) agreement between the Operator, Delta County and the USGS. <br />The Fire Mountain Canal will be monitored 3 times per year during May, July <br />and September at the designated upstream and downstream monitoring <br />locations shown on Map 9. Field parameters will be measured during each <br />monitoring event. A full suite sample from List 1 will be obtained semi- <br />annually during the first and third monitoring event. <br />Freeman, Sheep Corral and Dove Gulches will be monitored quarterly at the <br />• designated upstream and downstream monitoring locations shown on Map <br />9. Field parameters will be measured each quarter. A full suite sample from <br />List 1 will be obtained semi-annually during the second and fourth quarters. <br />Iron Point Gulch will be monitored quarterly at the designated downstream <br />monitoring location shown on Map 9. Field parameters will be measured <br />each quarter. A full suite sample will be obtained semi-annually during the <br />second and fourth quarters. <br />The North Fork of the Gunnison River will be monitored quarterly at the <br />designated upstream and downstream monitoring locations shown on Map <br />9. Field parameters will be measured each quarter except flow will not be <br />estimated. Base flow for the river will be obtained from the USGS Somerset <br />water stage recorder. The gaging station is located in the SE'/<SW'/< of <br />Section i0, Township 13 South, Range 90 West in Gunnison County <br />approximately 2.3 miles east of Somerset and 4.8 miles upstream from <br />Hubbard Creek. The recorder is located on the south bank of the river <br />across from the reclaimed Hawksnest Silos. The gage is a water-stage <br />• recorder with satellite telemetry. A full suite sample from List 1 will be <br />obtained semi-annually during the second and fourth quarters. During <br />PR-04 2.05 - 77 - 01(01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.