Laserfiche WebLink
,: <br />E~~A <br />S Coal Company <br />Seneca <br />~u <br />°%~,s,~ JAS 23 1995 <br />o~,~,,ne~a~s a <br />Gep/09Y <br />Ms. Susan Burqmaier <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />January 16, 1995 <br />RB: Seneca II Mine (C-80-005) Quarterly Stockpond Inspection <br />Dear Ms. Burqmaier: <br />Enclosed are copies of the fourth quarter stockpond inspections <br />for those structures at Seneca II that have been certified. <br />Inspections for Stockponds T-15, T-16, T-25, T-26, T-28, T-30 <br />and T-31 are also included. Construction of these stockponds has <br />been completed and the 'as-built' certifications will be <br />submitted as soon as possible. <br />Also, maintenance items noted in the October CDMG inspection <br />were unable to be completed due to winter weather conditions. <br />These items will be addressed when ground conditions are <br />conducive for the necessary repairs. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />c: Fred Fest <br />Dennis Jones <br />iii-iiiiiiiiiiiii iii <br />999 <br />ny <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (303) 276-3707 • FAX (303) 276-3014 <br />