Laserfiche WebLink
ATTACI IMENT 20-C <br />SHRUB PLOT SLIDE REMEDIATION PLAN <br />A small slide/slump occurred above Pond O16A adjacent to the new aspen planting azea during <br />spring snowmelt 2007. The affected azea is approximately 325 feet by 180 feet (1.3 acres) in extent. <br />See attached photograph 1. <br />It is believed that saturated materials placed this area from road maintenance over a series of winters, <br />and the proximity to the lower extent of the final pit has resulted in a situation that is resulting in <br />discharging water (i.e., a spoil spring) and overburden settlement. <br />The remediation plan consists of regrading/smoothing the slump scarp and installing french drain(s) <br />as needed to conrtol and duect water discharge from within the slide/slump block. The location(s) <br />of the french drain will be determined in the field during the regrading. <br />The attached figure, Typical French Drain, shows a typical cross section of the french drain to be <br />installed, while Exhibit 12-2, Operations Plan, shows the location of the Shrub Plot Slide. <br />