Laserfiche WebLink
2.05.4 page 8 <br />MIt29 January 2006 <br />2) Re-grading of the permit area <br />(8.12acres initial, additional 1.86 acres after pond removal) <br />3) Top soil dispersement, <br />compacting, roughing <br />3 weeks <br />1 week <br />4) Seeding and mulching 1 week <br />5) Erosion control, inspection <br />and maintenance of diversion <br />channels <br />6) Pond removal, final drainage <br />channel installation, reseeding (if necessazy) 1 week <br />RECLAMATION COSTS <br />Reclamation costs have been detailed in Appendix 9(2). <br />On-going <br />A copy of this bond is on file with the Division of Minerals and Geology. <br />