Laserfiche WebLink
TABLE 20-1 <br /> • <br />POST MIIVING LANDFORM MASS BALANCE <br /> Area I Area 2 <br />Pre-Mining Pit Material Volume Calculations <br /> <br />Pre-Mining Material Volume 12,404,306 bcy 31,738,823 bcy <br />Virgin Overburden Material Volume 9,623,200 bcy 27,087,354 bcy <br />Total In-place Coal Volume 2,781,106 bcy 4,651,469 bcy <br />Recoverable Coal Volume 2,526,900 bcy 4,186,322 bcy <br />Non-recovered Coal and Parting Material Volume 254,206 bcy 456,147 bcy <br />Pre-Mining Overburden Volume 9,877,406 bcy 27,552,501 bcy <br />Total Pit Spoil Volume 11,062,694 Icy 30,858,801 Icy <br />Pre-Mining Material Mass Volume: <br />Total Pit Spoil Volume 11,062,694 Icy 30,858,801 Icy <br />Total Pre-Minmg Material Volume 12,404,306 bcy 31,738,823 bcy ~, <br />Post Mining Material Volume Calculaticns ~I • <br />Post Mining Spoil Material Calculated: <br />Post Mining Spoil Material Volume Ilnternall 9,967,208 cy 31,502,979 cy <br />Post Mining Spoil Material Volume IExternall 188,012 cy _ ~~ <br />Total Post Mining Spoil Volume 10,153,220 cy 31,502,979 cy <br />Post Mining Overburden Material Excavated <br />Pre-Mining Total Pit Spoil Volume 11,062,695 cy 30,858,801 cy <br />Pos[ Mining Overburden Material IExternall 99,612 cy _ <br />Total Overburden Material Excavated ISwelledl 11,162,577 cy 30,858,801 cy <br />Post Mining Material Volume Comparison <br />Total Post Mining Spoil Volume 10,153,220 cy 31,502,979 cy <br />Total Overburden Material Excavated 11,162,577 cy 30,858,801 cy '~ <br />Volume Difference 1,009,357 cy 644,178 cy <br />• <br />4 Revised 2/99 <br />