Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(17) <br />Mine: Southfield <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #5 <br />Second Quarter, 2005 <br />June 30, 2005 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies north east of the main facilities area. All drainaye from the <br />reclaimed mine facilities area is directed to this pond. The primary discharge gale has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover <br />2). Erosion forming Gullies: <br />3). is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellen Moderate Few Poor <br />Extensive Some Fe None <br />A). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Yes <br />Yes <br />Yes <br />No /~- <br />No v <br />No~j <br />Yes <br />No r~ <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes r/ No <br />Yes ~ No <br />Yes ~ No <br />Yes _ <br />Just starting <br />None <br />No v~ <br />Page 1 of 2 <br />