My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24132
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:20 PM
Creation date
11/20/2007 4:25:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Hydrology
Doc Date
5/16/1997
Doc Name
4TH QTR 1997 Inspections
From
BLUE MOUNTAIN ENERGY INC
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~•° Western Fuels-Utah, Inc. Deserado Mine <br />Quarterly Sediment Pond P.E. Inspection Report <br />Date of Inspection: 12/I I/'>7 Inspector: Gordon Bell -- Environmental Engineer <br />Operational Status <br /> ype of pprox a tment amp. <br /># Ponds Name H2O Level % Level % Outflow Yes No Comments <br /> e on s - <br />2 RP-1 30 20 N.D. X <br />3 RP-2,3 50 50 YES X pumped after treating <br />4 RP-4 50 40 N.D X <br />5 RP-5 70 IS N.D. X <br />6 RR-1 (I 5 N.D. X <br />7 RR-2 0 5 N.D. X <br />8 RR-3 10 5 N.D. X <br />9 SS-I 75 35 YES X <br />10 SS-2 (1 5 N.D. X <br />II HSL-I 0 5 N.D. X <br />12 SDH-2U (1 5 N. D. X Shutoff?'96 due to mine sealing <br />13 SDH-2L (I 5 N.D. X Shut off 2/96 due to mine sealing <br />14 SDH-3/5 (I 10 N.D. X Shu[ off 2/96 due to mine sealing <br />IS EP-I 0 5 N.D. X <br />16 Sumps RRS-I 0 5 N. D. X <br />17 TS-I 0 5 N.D. X <br />IS TS-2 (l 10 N.D. X <br />19 EP-2 (1 5 N.D. X <br />20 EP-3 (I 2 N.D. X <br />21 EP-4 (l 2 N.D. X <br />32 Proc Pond PP-I 50 45 N.D. X <br />23 PP-2 40 35 N.D. X <br /> <br />Pond Descriptions <br /> <br /># ype o <br />Ponds <br />Name <br />Description <br /> e on s - - orta <br />2 RP-I Refuse Area I <br />3 RP-2,3 Refuse Area 2/3 <br />4 RP-4 Refuse Area 4 <br />5 RP-5 Refuse Area SA <br />6 RR-I Railroad Fill Slope Pond 1 <br />7 RR 2 Railroad Fill Slope Pond 2 <br />8 RR-3 RaiUoad Loop Pond <br />9 SS-I Slot Storage Building Access Road Pond <br />10 SS-2 Slo[ Storage Building Emergent Coal S[orage Area Pond <br />I I HSL-I Halandras Sanitary Land Fill Pond <br />12 SDH-2U Down Hole Sump Upper InFluent Pond <br />13 SDH-2L Down Hole Sump Lower EfFluent Pond <br />14 SDH-3 Down Hole Sump Discharge 2 <br />IS EP-I East Portal <br />16 Sumps RRS-I Railroad Sum I <br />17 TS-I TransferBuildin 1 <br />18 TS-2 Transfer Buildin 2 <br />19 EP-2 Eas[ Laydown Pad <br />20 EP-3 West Laydown Pad <br />21 EP-4 Turnaround Pad <br />22 Proc Pond PP-I Prep F'lant Proccess Pond <br />23 PP-2 Prep F'lant Process Pond <br /> <br />Pagel <br />
The URL can be used to link to this page
Your browser does not support the video tag.