Laserfiche WebLink
QU~.R 1 LL.LI' <br />-- - • <br />OPERATOR: Snowmass Coal Coy <br />PiINE: North Thompson Creek <br />• DATE OF INSPECTION: June 17,_,_ <br />• <br />• <br />POATD IDEATIFICATION <br />TYP£ OF POND <br />PO:~ I\SPECTIO\ REPORT <br />iPany <br />Mines <br />1985 <br />1 2 3 4 5 <br /> <br />P-7 <br />P-8 <br />P-9 e use <br />Pond pper as <br />Detention Detention Sediment Sediment <br />OPERATIO\AL STATUS AT TIME OF INSPECTION <br />Approximate water level: Dry, Dry, ~ 3; Capacity, Dry, Full <br />Sediment level(% total storage): 100, 10%, 25%, 10%, Can't Tell <br />Outflow(cfs):~o. No, No, No, No, <br />FEATURES <br />PROBLE"1 <br />COMATF!~TS <br />EROSIONAL: 'E NO <br />Rills b Gullies on Embankment <br />Inadequate l~egetation <br />Outlet Channel Erosion ~ <br />Burrows <br />Other x <br />STRUCTURAL: 'ES NO <br />Differential Settling <br />Cracks or Slides x <br />Seepage x <br />Other x <br />PURTENANT STRUCTURES: ES NO <br />Defective Spillways x <br />Dewatering Device Clogged x <br />Faulty Gates, Baffles, Pumps x <br />Other x <br /> <br />t <br />DITIONAL COMMENTS: <br />fAINTENANCE REQUIRED: The upper wash plant pond is full of "B" seam <br />drainage. Pond P-9 will be cleaned in July or August. <br />NAME OF INSPECTOR: Scott Jones <br />RL/82 <br />