Laserfiche WebLink
• Limitations: This report has been prepared in accordance with generally accepted soil and pavement <br />engineering practices in this azea far use by the client for design purposes. The conclusions and <br />recommendations submitted in this report are based upon the assumed traffic loadings and the data <br />obtained from the test holes advanced along the subject roadways. if during construction, soil and <br />ground water conditions pear to be different from those described herein, this office should be advised <br />at once so that reev a on of the recommendations may be made. We recommend the on-site <br />observation of the sub r e proofrolling, gravel placement and compaction by a qualified soils engineer. <br />Sincerely, <br />NORTIM'F.ST ONSULTANTS~ INC. <br />C).~i <br />~~ <br />• <br />• <br />lob No. 99-4004 Northwest Colorado Cotuultants, Inc. Page 6 <br />