Laserfiche WebLink
~ III IIIIIIIIIIIII III ~ <br />= STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />D,~p.tn mcnl ul Nawml R~SOUrc.eS <br />I : I f 5herm.tn SL, Ruum ? 15 <br />Denver, Cnluraclu ;40'_03 <br />hliunr: luul nl,n_3sa- <br />FA\: I SII11 N.i _'-OI U6 <br />DIVISION OF <br />M[NERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SA FETY <br /> Bill Owens <br />June 2, 1999 eovemnr <br /> Greg E. 1Valcher <br /> Etecutive Director <br />Fremont County Michael B. Lonp <br />615 Macon Avenue oivi:ion Direclnr <br />Canon Ciry, CO 81212 <br />RE: Howard Pit Nl & #2, M-99-033, Permit Issuance -C ounty Construction Material Operation <br />To Whom It May Concern: <br />On May 26, 1999 the Division of Minerals and Geology found Fremom County to have satisfied the applicable <br />requirements of C.R.S. 34-32.5-101 et ~. for obtaining a mining and reclamation permit. Therefore, a <br />permit is being issued. Two signed originals of the permit have been executed. We have kept one copy for <br />our files and are enclosing one copy for your use. It is your responsibility to comply with all of the terms of <br />the permit. <br />1. All of ilte original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all <br />of these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy <br />of the permit and the permit application az the mining operation as a reference for operating personnel, to help <br />ensure compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to dte permit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or wntacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, May 26, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $225.00. Please consult the Act, Rules and Regulations, and <br />your permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Sincerely, ~ <br />I~~ '~~ ~ ~~ ~I~-eE~ <br />MI HAEL B. L G <br />``~ivlsion Director <br />I <br />MBL/1Dl/SME <br />Enclosure <br />cc: Kenneth S. Klco, Azurite, Inc. <br />