My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54964
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:55 PM
Creation date
11/20/2007 4:23:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002020
IBM Index Class Name
Permit File
Doc Date
5/7/2002
Doc Name
Adequacy Review
From
DMG
To
City of Greeley
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lined Pit Guide 9 September 2000 <br />Supplementary water, if required, shall be added to the material by sprinkling on the earth fill, <br />and each layer of earth fill shall be conditioned by disking or other approved methods so that the <br />water is distributed uniformly throughout the layer. <br />Mechanical mixing to distribute water evenly in the soil is particularly important for highly plastic soils <br />that form lazge clods. <br />Compactive Energy <br />The energy of compaction is an important vaziable controlling the engineering properties of soil liner <br />materials. Increasing the energy of compaction increases the dry unit weight of the soil, decreases the <br />optimum moisture content, and reduces permeability. The compactive energy delivered to soil depends <br />on the weight of the compaction equipment, the number of equipment passes, and the thickness of the <br />loose lift of soil being compacted. The best combination of these factors to use when compacting low <br />permeability soil liners depends on the targeted maximum petmeability, equipmenC availability, <br />economic feasibility, experience on similaz projects, and test results with the site specific soils. For a <br />typical soil liner fill composed of weathered shale, the specifications may call for a minimum of 5 <br />passes over a maximum 9 inch thick loose lift with a 40,000 pound or greater compactor. <br />Size of Clods <br />Highly plastic soils almost always form large clods. For soils that form clods, they must be remolded <br />into a homogeneous mass that is free of lazge inter-clod pores if low permeability is to be achieved. As <br />discussed previously, when the soil is compacted wet of optimum that clods aze sufficiently soft to be <br />easily remolded. If dry clods must be reduced in size prior to compaction, which may be the case when <br />using ripped shale as a liner material, a road reclaimer or other similaz equipment may be used to <br />pulverize the material. <br />Bonding of lifts <br />Proper bonding of lifts is important in achieving low permeability in soil liners. Poorly bonded lifts <br />result in high horizontal permeability at lift interfaces. Water moving through a liner will spread <br />laterally along these interfaces increasing the likelihood of leaking at any permeable zones that may be <br />present in the underlying lift. To bond lifts together, the surface of the previously compacted lift should <br />be roughened so that the new lift can blend into the surface. The design should address lift bonding by <br />specification.of disking lift surfaces or using compactors with tamping feet long enough to fully <br />penetrate the specified loose lift thickness. <br />Keyway <br />The wedge of soil liner fill that will form the impermeable barrier around the perimeter of a reservoir <br />must be keyed into a competent impermeable strata at the floor of the pit. The keyway is installed by <br />
The URL can be used to link to this page
Your browser does not support the video tag.