Laserfiche WebLink
FLEET PRODUCTION AND COST ANALYSIS <br />• Yoast Reclamation Bond SCC 20-FEB-1 Page -27- <br />-------------------------------------------------------------------------------- <br />HAUL - Travel Time S Speeds <br />Yoast Reclamation Bond <br />I Course I Material IDensity Lbs per) Initial) I HAULER 637E I <br />I Desc I Qty TONS I LCY I HCY I Speed I I ID YOAST I <br />____________ ____________ _______ ______ _ __MPH-- I Tires 37.25-35 I <br />1Pit I 213,2741 2,075 12,518 I 0.00 I I Type E3 I <br />Empty Wt., TONS 56.04 Payload, TONS <br />I HAUL Distance Rolling Grade MPH <br />(Segment FEET Resis t$ $ Limit <br />I 1. 1,700 5.00 -3.00 30.00 <br />I Course <br />I Name <br />14 <br />Speed Corr. 1.001 <br />32.25 Code C134 I Alt. Corr.. 0.891 <br />--------------------- ----------------- <br />Potential Segment Speed Cumulative) <br />Speed Max at End Minutes I <br />33.36 30.00 0.00 0.91 I <br />RETURN - Travel Time b Speeds <br />Yoast Reclamation Bond <br />• <br />• <br />I Course I Course I Material IDensity Lbs pe <br />I Name I Desc I 4ty TONS I LCY I HCY <br />-------- ------------ ------------ ------- ------ <br />14 (Pit I 213,2741 2,075 12,518 <br />-------- ------------ ------------ ------- ------ <br />Empty Wt., TONS 56.04 Payload, TONS 32.25 <br />------------------------------------------------- <br />I RETURN Distance Rolling Grade MPH Potential <br />(Segment FEET Resis t$ $ Limit Speed <br />1 1. 1,700 5.00 3.00 30.00 19.70 <br />------------------------------------------------- <br />rlInitiall I HAULER 637E I <br />I Speed I I ID YOAST I <br />- --MPH-- I Tires 37.25-35 1 <br />1 0.00 I I Type E3 I <br />- ------- I Speed Corr. 1.001 <br />Code C134 I Alt. Corr.. 0.891 <br />----------- ---------------`- <br />Segment Speed Cumulative) <br />Max at End Minutes I <br />19.70 0.00 1.15 I <br />25-2-24 Revised 02/01 <br />