Laserfiche WebLink
• <br />• <br />• <br />Log of CTL / THOMPSON, INC. <br />Boring ® CONSULTING GEOTECHNICAL <br />AND MATERIALS ENGINEERS <br />JOB NO. 22.478 DATE GRILLED 11 /1094 <br />PROJECT NEW ELK MINE SHEET 1 OF <br />BORING NO. TH-201 LOCATION (N) (E) <br />DRILLING CONTRACTOR CUSTOM AUGER DRILLER DBT ENGINEER <br />DRILL RIG CME55 ELEVATION 7485.9 GROUND WATER LEVEL <br />Boring Method <br />^ HOLLOW STEM AUGER <br />® CONTINUOUS FLIGHT AUGER <br />^ ROTARY <br />^ AIR ROTARY <br /> CASING DEPTH <br />1( <br />2( <br />3C <br />4D <br />Sampling Method <br />S -STANDARD SPLIT SPOON <br />C -CALIFORNIA SAMPLE <br />A -AUGER CUTTINGS <br />N -CORE NX SIZE <br />O -CORE PO SIZE <br />T -SHELBY TUBE 3.0INCH <br />H -HAND DRIVE <br />B -BULK SAMPLE <br />~ SAMPLE <br />a <br />- J BLOW <br /> p ~ COUNT DESCRIPTION <br />- m <br />s w <br />t- w <br />a <br />i <br />~ > <br />fA z <br />H } <br />H <br />~ FILL, CLAY, SANDY, STIFF, MEDIUM MOIST, BROWN. <br /> C 19/72 FILL, COAL REFUSE, MOIST, BLACK <br /> T <br /> <br /> C 31/12 <br /> T <br /> NOTE: <br /> C 17/12 1. BORING DRY AT COMPLETION OF DRILLING, 2 DAYS AFTER DRILLING AND 78 DAYS AFTER <br /> DRILLING. <br /> 2. MONROR WELL INSTALLED TO FULL DEPTH. <br /> C 40/12 <br /> <br /> C 46/12 <br /> SAND, CLAYEY, POSSIBLE BEDROCK, SILTY, VERY DENSE, MOIST, BROWN. <br /> <br /> C ~/g CLAYSTONE, SANDY, SILTY, VERY HARD, MEDIUM MOIST, BROWN. <br /> <br />