Laserfiche WebLink
The remaining Excess Spoil will be utilized to achieve the postmining contours shown on Map 19. <br />Detailed geotechnical investigations were completed for both the West Pit Fill and the Section 16 <br />Fill by CTL/Thompson, Inc. Reports of the investigations are found in Exhibit 19. Construction <br />plans for the fills, addressing the requirements of Rule 4.09, Disposal of Excess Spoil, can also be <br />found in Exhibit 19. <br />The topography following mining and reclamation activities is shown on the Postmining <br />Topography Map (Map 19). Cross sections relating the premining and postmining topographic <br />configurations are presented as the Premining and Postmining Cross Section Maps (Maps 20 and <br />20A). <br />in the initial permit application, Map 30, Experimental Practice Design, showed the proposed <br />Streeter Fill design. In the current application, the title of Map 30 has been changed to Streeter <br />Fill Design and As-Built, to reflect termination of the Experimental Practice designation, and <br />provide an as-built drawing of the constructed fill. As shown on Map 30, the minor differences <br />between the design and the as-built configuration are insignificant. The primary difference, which <br />increases stability, is the change in the top elevation of the fill from 7300 feet in elevation to 7200 <br />feet. <br />Coal Handling Structures <br />Map No. I -Surface ownership shows pre-mining contours and Map 19A - Pos[mining Topography Gossard <br />Area shows post-mining contours of [he loadout. All facilities no[ to be included as part of [he post-mining <br />land use will be removed (see Section 2.05.5). After the facilities are removed, the land will be regraded to <br />blend with the existing undisturbed topography, retopsoiled and revegeta[ed in accordance with Section <br />• 2.05.4. <br />The detailed description of the various coal crushing, handling and loadout facilities for [he Colowyo <br />operation is found under [he Mine Facilities Section in 2.05.3. The location of the coal processing facilities <br />is found on the Existing Structures -North Map (Map 21) and the Existing Structures -South Map (Map <br />22). <br />• <br />2.05-37 Revision Date 5/8/03 <br />Revision No. TR-56 <br />