Laserfiche WebLink
area described in Attachment D to the permit revision. <br />~~ Specifically, this inCTudes: <br />1. I.S8 acres to be used for the stockpile, <br />2. that portion of the Beir Mine access road to be used <br />during construction and raintenance of the pile, <br />3. the 400-feet of light-duty road .heading northwest off cf <br />the access road to the stockpile „ <br />4, the upland diversion dit:h, <br />5. the txo ditches to divert runoff from the p11e to the <br />sedimentation pond, and <br />6. the sedimentation pond ard~ .i-ts emergency spi11-ray. <br />I understand that uFLC ~+iTl assurtre all further responsibility for <br />reclamation of the area described above and as shown in <br />Attachment C to their revision. A1sa,~I understand this to mean <br />that I am still responsible far reclamation of a17 other areas <br />+vithin Bear Hines 1 and 2 permit area. <br />S/i n~~ely, <br />• William A. Bear <br />President, Bear Coal Company <br />