Laserfiche WebLink
• Revegetation Cost Estimate <br />Activity <br />Ripping <br />Seedbed Preparation and Fertilization <br />Drill Seeding <br />Mulching <br />5.5 acres x 31,278 = <br />Topsoiling 5.5 acres (10 hrs. @ 385/hr <br />using a D8 bulldozer to redistribute <br />topsoil) <br />Removal of sediment control structures <br />including backfilling and regrading (10 <br />hrs. @ 385/hr using a D3 bulldozer. <br />Wildlife shrub clusters (purchase of tublings <br />plus labor to plant shrubs (1.5 acres) <br />lOX contingency <br />• Total Estimated Reclamation Costs <br />for Bonding Purposes <br />Cost/Acre <br />E 98 , <br />3 180 <br />5 600 <br />3 400 <br />1,278 <br />37,029 <br />3 850 <br />5 850 <br />51,150 <br />59,879 <br />51,000 <br />510,879 <br />The current Mt. Gunnison reclamation bond is 51.9M . Current <br />estimated reclamatioo_costs for the acreage presently disturbed <br />at the mine is 1.79M. Therefore the additional costs of re- <br />claiming the area proposed in this application will not require <br />an increase in bond. <br /> <br />