Laserfiche WebLink
• <br /> <br /> <br />ANACONDA 1Ainerala Company <br />555 Seventeenth Street <br />Denver, Colorado 80202 <br />Telephone 303 293 4000 <br />June 7, 1984 <br />Mr. Robert Liddle <br />Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Bob: <br />e~ <br />Reference is made to your letter of May 29, 1984 in which you <br />requested additional information pertaining to West Elk Coal <br />Company's (WECC) technical revision to Permit C-007-80 to redis- <br />turb the "U.S. Steel° laydown area. <br />The information you requested is provided below in the order in <br />which they were discussed and in the revised attachments to the <br />application. <br />1. <br />Prior sampling of topsoil depth indicates that between 12 <br />18 inches of suitable topsoil exists in the <br />be disturbed. All suitable topsoil will <br />stockpiled at the southeast corner o f the <br />area as shown on Attachment B. One or more <br />signs will be posted as appr opriate on the <br />identification. <br />and <br />area proposed to <br />be stripped and <br />proposed laydown <br />topsoil stockpile <br />pile for proper <br />2. A letter of agreement between WECC and U.S. Steel indicating <br />right-of-entry to the proposed laydown area or a copy of the <br />lease will be provided to you prior to your approval of the <br />revision. <br />3. The Mt. Gunnison 5-year permit boundary in the vicinity of <br />the laydown area has been provided on the revised Attachment <br />B. <br />4. It is estimated that removal of the outlet structures in the <br />sedimentation pond and backfilling and regrading of the pond <br />and sediment control ditches using a 08 hulldozer will take <br />approximately 10 hours. The additional cost far this work is <br />estimated to be, using current contractor costs, E850. I <br />have revised the Revegetation Cost Estimate provided in the <br />application to reflect these additional costs. I also took <br />the opportunity to correct an error in the Reve etation Cost <br />Estimate. The cost of topsoiling (E850) provide in tie <br />estimate was the cost for retopsoiling the entire 5.5 acres <br />of disturbance, not the per acre cost as described in the <br />estimate. <br />~M~COXD~ LinoN. COinp~nY p . GInYOn o1 htl,neeRleelMeQe~neMl <br />~MCO-\000-~ 14~]) <br />