Laserfiche WebLink
<br /> <br /> <br />• zy" <br />event plus the estimated sediment yield over a 2-year <br />period. <br />Construction of the sediment pond will be supervised, <br />inspected and certified after construction by a <br />registered professional engineer. Certification of the <br />constructed pond will be forwarded to the CMLRD upon <br />completion of the pond. <br />The runoff volume and peak discharges for the laydown <br />area were determined using TR-55. The laydown area <br />consists of the following subareas with curve numbers <br />indicated: <br />Area Designation Acreave Curve Number <br />Disturbed area 5.5 75 <br />Undisturbed area I.4 70 <br />Total Area 6.9 74 <br />Runoff volume expected from a 10 year, 24 hour event is <br />determined as follows: <br />10 year, 24 hour rainfall <br />Curve Number <br />Runoff Volume (Q) <br />q (10 yr., 24 hr. event} <br />Q <br />= 1.8 inches <br />= 74 ' <br />= 0.26 inch <br />0.15 acre ft. <br />= 5,512 ft.3 <br />Peak discharge from the area is determined as follows far <br />both the 10 year 24 hour event and the 25 year 24 hour <br />event: <br />10 year, 24 hour precipitation = 1.8 inches <br />25 year, 24 hour precipitation = 2.2 inches <br />Curve Number = 74 <br />D-5 <br />