My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54826
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:49 PM
Creation date
11/20/2007 4:20:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005033
IBM Index Class Name
Permit File
Doc Date
9/12/2006
Doc Name
Reclamation Cost Estimate
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />BULLDOZER WORK <br />Task # : 002 <br />Date : 09/12/2006 <br />User: ESC <br />State :Colorado <br />PermiUjob# : M-2005-033 <br />County :Larimer Abbreviation :none <br />Site : Gardels Pit Filename : M033-002 <br />Agency or organization name :DBMS <br />Permit or other job action :New 112 Application <br />Task description :Backfill 8 Grade Cell C to Grade <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DiOR - fOSU (2005) Horsepower ; 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization 9'0 <br />Cost Breakdown : Ownership cosUhour : $100.86 NA <br />OperatingcosUhour : $132.31 100 <br />Ripper op, cost/hour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cost/hour : $265.95 Total fleet cost/hour : x531.90 <br />,:. s; <br /> <br />MATERIAL QUANTITIES , <br />,.::. .:. <br />Initial Swell Loose <br />volume : 217,000 LCY factor : NA volume : 217,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Matedal consistency description ; <br />Loose stockpile <br />Average push gradient: 0.00 <br />Average site altitude : 5,000 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1,00 <br />Job efficiency : 0 83 <br />Spoil pile : 0.80 <br />Push gradient : i.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.52 <br />Adjusted unit production <br />Adjusted fleet production <br />694.5B <br />18 <br />(Cat HB) <br />LCY/hr <br />LCY/hr <br />Fleet size : 2 Dozers) Total job time : 188.33 Hours <br />Unit cost : $0.413 /LCY Total job cost : x89,532 <br />
The URL can be used to link to this page
Your browser does not support the video tag.