Laserfiche WebLink
CIRCES Cost Estimatina Software <br />sheet 1 of 2 <br />Agency or organization name :DBMS <br />Task # : pOy State :Colorado Permit/job # : M-2005-033 <br />Date : 09/12/2006 County : Larimer Abbreviation :none <br />User: ESC Site:GardelsPit Filename :M033-009 <br /> <br />Permit or other job action : New 112 Application <br />Task description : Mobilization/Demobilization <br /> <br /> <br />EQUIPMENT TRANSPORT RIG COST <br />,. <br />.:::: <br /> <br />Shift basis <br />; <br />1 perday <br /> . <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd hal/, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown ~ Ownership cosUhour: $16.63 $18.37 $22.33 <br /> Operating cosUhour : $44.38 $46.13 $50.07 <br /> Operator cosUhour : $27.66 $2766 $27.66 <br /> Helper cost/hour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Machine <br />Description Weighf/unit <br />(Tons) Ownership <br />Cost/hdunit Haul Rig <br />CosUhdunit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhdfleet DOT permit <br />CosUfleet <br />-Centdfugal pump - 90M, 6 t 1.11 $15.08 $88.67 2 $20750 $177.34 $0.00 <br />-CatD10R-fOSU(2005) 91.22 $88.63 $125.45 2 $428.16 $250.90 $0.00 <br />-Cat 627G 40.90 $56.90 $11755 2 $348.89 $235.10 $0.00 <br />-CAT 815E 22.97 $35.90 $88.67 1 $124.57 $88.67 $0.00 <br />-CAT 14H 20.70 $32.69 $88.67 1 $121.36 $88.67 $0.00 <br />-Revegetation Eq. 20.00 $40.00 $88.67 2 $257.34 $177.34 $0.00 <br />Subtotals : 51,487,83 51,018.02 50.00 <br />