Laserfiche WebLink
i <br />((" • PART I <br />Page 5 of 24 <br />Permit No.CO-0033665 <br />A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS (Continued) <br />2. Monitoring Requirements <br />In order to obtain an indication of the probable compliance or <br />non-compliance with the effluent limitations specified in Part 1, the <br />permittee shall monitor and report all effluent parameters at the following <br />required frequencies. <br />Effluent Parameter <br />Flow - m3/Day (MG D) <br />BODS a/ <br />Total Suspended Solids g/ <br />j • Fecal Coliforms-Number/100 ml <br />pH <br />Oil and Grease <br />Total Residual Chlorine h/ <br />Salinity L/ M/ <br />Measurement Frequency a/i/ Sample Type f/ <br />Weekly Instantaneous <br />Quarterly Grab <br />Quarterly Grab <br />Quarterly Grab <br />Weekly Grab <br />Weakly Visual or Grab <br />Weekly Grab <br />Quarterly Grab <br />Self-monitoring samples taken in compliance with the monitoring requirements <br />specified above shall be taken at the following location(s): 001, the outfall <br />from the sewage treatment plant prior to mixing with receiving water, as <br />shown in figure 2, page 23. <br />(/ • <br />