Laserfiche WebLink
PART 11 <br />Page No. 18 <br />Permit No. COG-850000 <br />B. RESPONSIBILITIES <br />5. Modification. Suspension, Revocation, or Temtination of Permits By the Division (continued) <br />iv. The Division determines that good cause exists to modify a permit condition because of events over which the permittee t~ <br />control and for which there is no reasonable available remedy. <br />v. The permittee has received a variance. <br />vi. When required to incorporate applicable toxic effluent limitation or standards adopted pursuant to ' 307(a) of the Federal act. <br />vii. When required by the reopener conditions in the permit. <br />viii. As necessary under 40 C.F.R. 403.8(e), to include a compliance schedule for the development of a pretreatment program. <br />ix. When the level of discharge of any pollutant, which is not limited in the permit, exceeds the level, which can be achievedby the <br />technology-based treatment requirements appropriate to the permittee under Section 61.8(2) ofthe Colorado Dischazge Permit <br />System Regulations. <br />x. To establish a pollutant notification level required in Section 61.8(5} of the Colorado bischazge Permit System Regulations. <br />xi. To coaect technical mistakes, such as errors in calculation, or mistaken interpretations of law made in detemtining permit <br />conditions, to the extent allowed in Section 61.10 of the Colorado Dischazge Permit System Regulations. <br />xii. When required by a permit condition to incorporate a land application plan for beneficial reuse of sewage sludge, to revise as <br />existing land application plaq or to add a land application plan. <br />xiii. For any other cause provided in Section 61.10 of the Colorado Dischazge Permit System Regulations. <br />c. At the request of a pemilttee, the Divisior may modify or terminate a permit and issue a new permit if the following conditions aze <br />met: <br />i. The Regional Administrator has been notified of the proposed modification or termination and does not object in writing <br />thirty (30) days of receipt of notification, <br />ii. The Division finds that the permittee has shown reasonable grounds consistent with the Federal and State statutes and <br />regulations for such modifications or termination; <br />iii. Requirements of Section 61.15 of the Colorado Dischazge Pemit System Regulations have been met, and <br />iv. Requirements of public notice have been met. <br />d. Permit modification (except for minor modifications), termination or revocation and reisstrance actions shall be subject to the. <br />requirements of Sections 61.5(2), 61.5(3), 61.6, 6 ].7 and 61.15 ofthe Colorado DischazgePeaxnit System Regulations. The Division <br />shall act on a permit modification request, other than minor modifications requests, within 180 days of receipt thereof. Except for <br />minor modifications, the terms of the existing permit govern and aze enforceable until the newly issued permit is formally modified <br />or revoked and reissued following public notice. <br />e. Upon consent by the perrnittee, the Division may make minor pemtit modifications without following the requirements of Sections <br />61.5(2), 61.5(3), 61.7, and 61.15 of the Colorado Discharge Pemtit System Regulations. Minor modifications to pemrits aze limiteei <br />to: <br />i. Correcting typographical errors; or <br />ii. Increasing the frequency of monitoring or reporting by the pemtittee; or <br />iii. Changing an interim date in a schedule of compliance, provided the new date of compliance is not more than 120 days after the: <br />date specific in the existing permit and does not interfere with attainment of the final compliance date requirement; or <br />iv. Allowing for a transfer in ownership or operational control of a facility where the Division determines that no other change in <br />the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, <br />coverage and liability between the current and new permittees has been submitted to the Division; or <br />v. Changing the construction schedule for a dischazger which is a new source, but no such change shall affect a disch~:: <br />obligation to have all pollution control equipment installed and in operation prior to dischazge; or <br />vi. Deleting a point source outfall when the discharge from that outfall is terminated and does not result in dischazge of pollutant <br />from other outfalls except in accordance witlt permit limits. <br />f. When a permit is modified, only the conditions subject to modification are reopened. If a permit is revoked and reissued, the entire- <br />permit is reopened and subject to revision and the permit is reissued for a new terra <br />