My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54803
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:48 PM
Creation date
11/20/2007 4:20:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
1/9/2004
Section_Exhibit Name
Volume 8A NPDES Permit Appendix
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ PARTt <br />Page No.''-: <br />Permit No. COG-850006- <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />• 3. Monitoring Requirements (continued) <br />Oil and Grease - In the event that an oil sheen or floating oil is observed, a grab sample shall be collected, analyzed, and reported onthe - <br />appropriate DMR. In addition, corrective action shall be taken immediately to mitigate the discharge of oil and grease. A description of ~ <br />the corrective action taken should be included with the DMR <br />Total Dissolved Solids (TDS) monitoring is required only for discharges to the Colorado River Basin. See specific facility certification I <br />rationale to detemtine whether TDS monitoring is requued. ' <br />Total phosphorus (as P) monitoring is required for facilities which dischazge into the following drainage basins: Cherry Creek basin, <br />Chatfield Reservoir basin (i.e. upstream of the USGS gage at Waterton and on Plum Creek), Dillon Reservov basin (i.e. Ten Mile Creek, <br />Snake River, Blue River, all tributaries to the Dillon reservoir), and Bear Creek basin. The Division also reserves the right to include <br />phosphorus monitoring for any receiving waters that may later'enter into phosphorus monitoring requirements. Ifphosphonu monitoring <br />is a requirement of the permit then it shall be included within the terms and conditions of the individual Certification Rationale of the <br />permit. Additional monitoring for phosphoms shall be included on the (DMR) and shall be subject to the permit's monitoring and <br />reporting requvements. Phosphorus sampling shall be on a quarterly basis, taken as a grab sample. <br />C. DEFINITIONS OF TERMS <br />1. "Continuous" measurement, is a measurement obtained from an automatic recording device which continually measures provides <br />measurements. <br />2. "Daily Maximum limitation" means the limitation for this parameter shall be applied as an instantaneous maximum (or, for pH or DO, <br />instantaneous minimum) value. The instantaneous value is defined as the analytical result of any individual sample. DMR's shall include <br />the maximum (and/or minimum) of all instantaneous values within the calendaz month. Any instantaneous value beyond the noted daily <br />maximum limitation for the indicated pazameter shall be considered a violation of this permit. <br />3. "Grab" sample, is a single "dip and take" sample so as to be representative of the parameter being monitornd. <br />• 4. "In-situ" measurement is defined as a single reading, observation or measurement taken in the field at the point of dischazge. <br />5. "Instantaneous" measurement is a single reading, observation, or measurement performed on site using existing monitoring facilities. <br />6. "New source" is generally defined as a coal mine (or major alteration to a coal mine) the constmction of which commenced after May 4, <br />1984. See 40 CFR 434.11(j) for the complete definition. <br />7. "Quarterly measurement frequency" means samples maybe collected at any time during the calendaz quarter if a continual dischazge <br />occurs. If the dischazge is intermittent, then samples shall be collected during the period that dischazge occurs. <br />8. "Settleable solids analytical procedure" is contained in 40 CFR 434.64. The method detection limit for measuring settleable solids under <br />this part shall be 0.4 ml/I. <br />9. "Thirty (30) day average" means the arithmetic mean of all samples collected during athirty-consecutive-day period. The pemrittee shall <br />report the appropriate mean of all self-monitoring sample data collected during the calendaz month on the Dischazge Monitoring Reports. <br />Samples shall not be used for more than one reporting period. <br />10. "Total Metals" means the concentration of metals detemvned is an unfiltered sample following vigorous digestion (Section 4.1.3), or the <br />sum of the concentrations of metals in both the dissolved and suspended fractions, as desrnbed in Manual of Methods for Chemical <br />Analysis of Water and Wastes. U.S. Environmental Protection Agency, Mazch 1979, or its equivalent <br />11. "Visual" observation is observing the discharge to check for the presence of a visible sheen or floating oil. <br />12. "Water Quality Control Division" or "Division" means the state Water Quality Control Division as established in <br />25.8-101 et al. <br />Additional relevant defmitions are found in the Colorado Water Quality Control Act, CRS §§ 25-8-101 et sue., the Colorado Dischazee <br />Pemrit System Reeulations, (Regulation 61 - 5 CCR 1002-61) and other applicable regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.