Laserfiche WebLink
<br />COAL COMP/aNY QUARTERLY PCND INSPECTION REPORT <br />Inspector Name: LA/l//v /~e1~/~P Date: /d -26- 92 <br /> <br />Pond Number: ~ g Date Last Inspection: 7-/4 92 <br /> <br />Site Name: ~~DA Quarter:_ ~„~ f~ <br /> <br />1. Design Depth Measured From Spillway Invert - g a <br /> <br />Z. Design Maximum Sediment Level Measured From Spillway Invert 4,7 <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 6•$ <br /> <br />4. Water Level Measured From Spillway Invert ~vo.ve <br />5. Discharge Through Spillway Since Last Inspection - Yes X No <br />6. Ri 11 s and Gullies Yes X No <br />7. Vegetation Adequate X Yes No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows Yes X No <br />10. Cracks Yes X No <br />11. Seepage -Yes X No <br />12. Spillway Clogged _ Yes k No <br />13. Valves Operational X Yes _ No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />-- ¢ ~ ~~ -- <br />3 ~ 0. o 00 ~ h v <br />SPILLWAY SNVE, <br />~ ~°a C <br />A ~f~ <br />