Laserfiche WebLink
t< <br />%`~ I~ARAGON ANALYTICS <br />225 Commerce Drive ~ Fort Collins, CO 80524 C= (800) 443-1511 0~ (970) 490-1511 f~ FAX (970) 490-1522 <br />RECEIVE® <br />November 4, 2005 <br />Mr. Eric Hodek <br />CEMEX, Inc. <br />P.O. Box 529 <br />Lyons, CO 80540 <br />Re: Paragon Workorder: OS-09-241 <br />Client Project Name: None Submitted <br />Client Project Number: None Submitted <br />Dear Mr. Hodek: <br />NOV 16 2005 <br />Division of Minerals and Geology <br />Six water samples were received from CEMEX, Inc. on September 30, 2005. The samples <br />were scheduled for Metals (pages 1-11) and Inorganics (pages 1-13) analyses. <br />The results for these analyses are contained in the enclosed reports. <br />Thank you for your confidence in Paragon Analytics. Should you have any questions, please <br />call. <br />Sincerely, j/ ` <br />aP ragon Analytics <br />Julie Ellingson <br />Project Manager <br />JME/jb <br />Enclosure: Report <br />.~ (Division Of rDataChem (Laboratories, Znc. <br />