My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54710
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:43 PM
Creation date
11/20/2007 4:17:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001038
IBM Index Class Name
Permit File
Doc Date
4/6/2001
Doc Name
SALES RECEIPT
From
DMG
To
BENNETT SAND AND GRAVEL INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Reclamation will consist of revegetation with non-irrigated grasses of 45+ acres and construction <br />of a permanent private road of 2+ acres. This will involve the following reclamation phases. <br />Phase 1 - 15f acres of the Phase 1 Mining area, excluding the Plant Site area and <br />the permanent future private road area along the east boundary of the <br />permit area. <br />Phase 2 - 9.5~ acres of the Phase 2 Mining azea, excluding the permanen[ future <br />private road area along the east boundary of the permit area. <br />Phase 3 - 9.5± acres of the Phase 3 Mining area, excluding the permanent future <br />private road area along the east boundary of the permit area. <br />Phase 4 - 9.Sf acres of the Phase 4 Mining azea, excluding the permanen[ future <br />private road azea along the east boundary of the permit area. <br />Phase 5 - 2~ acre Plant Site area, which will be located in the northwest corner of <br />permit area in the Phase 1 Mining area. <br />Reclamation will be undertaken in the following manner for each phase: <br />1. Except for the area of the permanent private road areas, utilize any stored <br />overburden material and sand spoils from the plant's operation to level and regrade <br />disturbed areas, including areas where surface material and overburden may have <br />been stored, to minimum 2% and maximum of 3H (horizontal) to 1V (vertical) <br />slopes. <br />Z. Rip and scarify any compacted areas, except the area of the permanent private <br />road. <br />3. Respread available surface material for revegetation. <br />4. Revegetate per the accompanying recommendations in EXHIBIT I/J. <br />With Phase 5 revegetation, the operator shall also revegetate all areas of Phases 1 thru 4 where <br />revegetation was not previously successful. The operator shall to revegetate one other time, 1 year <br />after Phase 5 revegetation, any areas where revegetation is still not successful. However, given <br />the sparseness of existing vegetation and the unsuitability of soil conditions for revegetation, proof <br />of this final revegetation activity will be deemed completion of reclamation activities. <br />The map on the next map "Exhibit F -Reclamation Map" shows the reclamation plan graphically. <br />
The URL can be used to link to this page
Your browser does not support the video tag.