Laserfiche WebLink
COLORADO DEPARTMENT OFPUBLICHEALTHAND ENVIRONMENT, Water Quality Control Division <br />Rationale -Page 70, Permit No. CO-0000132 <br />B. Monitoring <br />!. ERluent Monitorin¢: Effluent monitoring will be required as shown in Tables VI-5, YI-6, and VI-7. Refer to the permit <br />for locations of monitoring points. <br />Table VI-S-Monitoring Requirements for OutjaU 01 S <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Once per week Instantaneous or Continuous <br />TSS, mgA Once per month Grab <br />pN, s.u. Once per week In-situ <br />Oil and Grease, mg/l Once per week Visual <br />TDS, mg/1 Once per quarter Grab <br />WET, Acute Once per quarter Grab <br />Iron, Total, ug/1 Once per month Grab <br />Table VI-6-Monitoring Requirements for Outjalls 007, 009, OIO, 012, 013, 014, 016, and 017 <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Once per month Instantaneous or Continuous <br />TSS, mg/1 Once per month Grab <br />pH, s. u. Once per month In-situ <br />Oil and Grease, mg/l Once per month Visual <br />TDS, mgR Quarterly Grab <br />Iron, Total, ug/I Once per month Grab <br />Settleable Solids, ml/1 Once per month Grab <br />Table VI 7-Monuoring Requirements for OutfaU DI S <br />Parameter Measurement Frequency Sample Type <br />Flow, MGD Once per week Instantaneous or Continuous <br />TSS, mgR Once per month Grab <br />pH, s. u. Once per week In-situ <br />Oil and Grease, mg/1 Once per week Visual <br />TDS, mg/1 Quarterly Grab <br />Total Residual Chlorine, mg/1 Once per week Grab <br />1. Additional MonitorinP: As described in section YLA.2.d.i., a 71-time analysis for total recoverable (TRf arsenic, <br />potentially dissolved (PD) cadmium, TR trivalent chromium, PD copper, dissolved and TR iron, PD manganese, total <br />mercury, PD nickel, PD selenium, PD silver, and PD zinc, is needed for ou all 075. The first sampling shall occur <br />during the first month after the permit becomes effective (or upon commencement ofdischarge) and sampling shall <br />continue for the next eleven consecutive months. If no discharge occurs during the month, sampling sha77 resume when <br />discharge resumes and continue until twelve samples have been collected and analysed using approved methods with <br />method detection limits as low or lower than those specified in Part I.E.3. of the permit. <br />C. Reporting <br />1. Discharee Monitoring Report: Oxbow Mining, LLC shall submit Discharge Monitoring Reports (DMRs) on a monthly <br />basis to the Division. The Division now requires all permiuees to submit DMRs monthly. These reports shall contain <br />the required summarization of the test results for parameters shown in Tables VI-4 and VI-S above and Pan IB.1 ojthe <br />permit. See the permit, Part LE.1. for details on such submission. <br />2. Additional Reporting.' The results of the twelve-time analysis describedpreviouslysholl be submined as required. <br />Gost Revised: 3/19/2004 <br />