Laserfiche WebLink
CDPS FACILITY INSPECTION REPORT <br />Code CDPS Permit No. Insp. Date Insp Type Inspector Facility Type Rating Biomonitodng OA County No. <br />~N CO-0000906 8/5/2003 © ~ ~ ® ~D ~ 36 <br />Name of Facility Entry Time <br />Pickelwire Processing, L.L.C. -New EIk Mine 8:30:00 AM Permit effective date: <br />Physical Location: a/1/2002 <br />Approximately 8 miles west of Weston, CO on Hwy 12 Permit el~iration date: <br />Name(s) of On-Site Representative(s) Phone No. 3/31/zoo7 <br />Ron Thompson (719) 846-4975 <br />Facility Mailing Address: <br />4422 Bryan Station Road, Lexington, KY 40516 <br />Treatment <br />Facility Level: 0 <br />Operator Level ~ D-11374 <br />Cerfificate #: 11374 <br />Operator In Charge: Ron Thompson <br />Email Address: <br /># of Operators: ~i <br />Phone #: 719-aas~ts75 <br /> Collection <br />Facility Level: <br />Operator Level 0 0 <br />Certificate #: 0 <br />Operator in charge: <br />Email Address: <br /># of Operators: <br />Phone #: 0 <br />Name(s) of Person(s) Conducting Inspection Title: Phone No. <br />David W. Knope District Engineer (779) 545-4650 <br />(S =Sa45radory, M = Marginal, U = UnsatisFaclory, WA =Not Applipble, N = NM EvaluateE) <br />S Permit S Flow Measuring <br />S Records/Reports N Laboratory <br />S Site Review nla EffluenVReceiving Water <br />On Site Analysis: Settleable Solids <br />Contract Lab ACZ Labs <br />Total Taps: Industdal Taps 0~ <br />Na Pretreatment S Operations/Maintenance <br />Na Compliance Schedule Na Biosolids Disposal <br />S Self monitoring S Stormwater <br />Sample Per Permit: Yes Na SSO CMOM <br />Dces Permit Match Facility?: Yes <br />No. of Lift Stations ~0 I/I Problem: No <br />Treatment Process(es)Used <br />Design Capacity -Hydraulic (MGD): ~ Present Hydraulic Loading (MGD): ~ Hydraulic Capacity Used °h: e <br />Design Capacity -Organic (#/day): Present Organic Loading (#/day): Organic Capacity Used %: <br />~earscreen <br />Activated Sludge <br />Aerobic Digester <br />~Coagulalion <br />Other Treatment Thy <br />COMMENTS: <br />Outfall <br />Treatment Units <br />~Mechaniral Bar Saeen ~COmminutor Grit Removal <br />~RBC ~SBR Trickling Filter Secondary Clarifier <br />Filter Press ~Centdfuge Drying Bed ~CL2 ~DeCL2 <br />Polishing Pond ~3 Lagoon Aerated Lagoon Land Trmt /Reuse <br />mechanical domestic W WTF (033) has been taken out of service, and the discharge point is ina <br />Primary Cladfier <br />Anaerobic Digester <br />~UV Filter <br />W elland <br />The ceal processing facility has Gosed down. The treatment plant for the coal processing facility has been taken out of service. <br />Reclamation started on the sedimentation pond for Out(all 005 in the spdng of 2003 and the outfall is inactive. Pond 005 has <br />been filled in, the site graded, and seeds planted. The weir box for Ouffall 007 should be cleaned of settled solids and vegetative <br />growth. Continue to maintained erosion control measures. Stormwater runoff covered under separate permit (COR-040192). <br />Latltude Longitude Flow Device Date Calibrated Accurate? Outfall Name <br />001 no discharge ~ pump from mine <br />004 37 9.39 104 58.37 bucket 8 stopwatch ~ Pond <br />005 37 9.37 104 58.29 inactive ~ Reclaimed <br />