My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54640
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:40 PM
Creation date
11/20/2007 4:15:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Doc Name
Air Pollution Permits
Section_Exhibit Name
Tab 16 Appendix 16-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />GENERAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 6, 7, and 8) <br />.. . <br />1. This permit is issuetl in reliance upon the accuracy and completeness of information supplied by the applicant <br />and is conditioned upon conduction of the activity, or construction; installation and operation of the source, in <br />accordance with this information and with representations made by the applicant or applicant's agents. It is valid <br />only for the equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated athenvise, the general and specific conditions contained in this permit have been deter- <br />mined by the APCD to be necessary to assure compliance with the provisions of C.R.S. 1973, 25-7-11a(4)(g) <br />and, as such, shall be enforceable under the provisions of C.R.S. 1973, 25-7-115 after final approval of the permit <br />has been granted. Emission limits are imposed to ensure that emissions will not (1) interfere with reasonable <br />further progress toward attainment of the NAAOS for pollutants as required by C.R.S. 1973, Sections 25.7-1 t4(4xgj(IX6) <br />and 25-7-301(1); Section t72(b)(3) of the Federal Clean Air Act, 42 USC 7502 (bx3); and Section IVD.2. of the <br />Air Quality Control Commission Regulation No. 3 or {2) result in an exceedance of the NAAQS for pollutants <br />as required by C.R.S. 1973, Sections 25-7-102, 25.7.105(1)(a)(I), and 25-7-201(1)(b); Section 165(a)(3) of the Clean <br />Air Act, 42 USC 7475(ax3); and Section IV.D.t.c. of Air Oualiry Control Commission Regulation No. 3. <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to, or appeal <br />ot, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence this permit shall <br />be deemed denied ab initio. This permit may be rewked at any time prior to final approval by the Air P ~llution <br />Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air <br />Quality Control Commission {AQCC), including failure to meet any express term or condition of the permit. <br />4. This permit and any required attachments must be retained and made available for inspection upon request at <br />the location set forth herein. With respect to a portable source which is moved to a new location, a copy of the <br />revised Air Pollutant Emissions Notice (APEN) (required by law to be submitted to the APCD whenever a portable <br />• source is relocated) should be attached to this permit. The permit may be reissued to a new owner by the APCD <br />as provided in Section 111.9. of AQCC Regulation No. 3 upon a request for transfer of ownership. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this activity or operation <br />of this source. Final approval of the permit must be secured from the APCD in writing in accordance with the <br />provisions of C.R.S. 1973, Section 25-7-714(4)(j) and Section IV.H. of AQCC Regulation No. 3. Final approval <br />cannot be granted until the operation or activity crommences and has been verified by the APCD as conforming <br />in all respects with the conditions of the permit. If the APCD so determines, it will provide written documentation <br />of such final approval, which does constitute "final" authority to operate. <br />6. THIS PERMfT AUTOMATICALLY EXPIRES IF you (1) do not commence construction or operation within 78 months <br />after either the date of issuance of this-permit or the date on which such construction or actwiy was scheduled <br />to commence as set forth in the permit, whichever is later, (2) discontinue construction for a period of 18 months <br />or more, or (3) do not complete construction within a reasonable time of the estimated completion date. Exten- <br />sions of the expiration date may be granted by the APCD upon a showing of good cause by the permittee. <br />7. YOU MUST notify the APCD at feast thirty days (fifteen days for portable sources) prior to commencement of <br />the permitted operation or activity. Failure to do so is a violation of C.R.S. 1973, Section 25-7-1 t4(4)(j) antl Regula- <br />tion No. 3., Section IV.H.1., and can result in the revocation of the permit. <br />8. YOU MUST obtain final approval within six months of the commencement of operation as that term is defined <br />by the AQCC. Failure io obtain final approval will result in the revocation of the permit. <br />9. Violation of the farms of a permit which has received final approval or of the provisions of the Colorado A;r Quality <br />Control Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions <br />under C.R.S. 1973, Sections 25-7-115 (enforcement), 25-7-121 (injunctions), 25-7-122 (civil penalties) and 25-1-114 <br />(criminal penalties). <br />i.ra <br />
The URL can be used to link to this page
Your browser does not support the video tag.