Laserfiche WebLink
Metals by 200.8 <br />Method EPA200.8 Revision 5.4 <br />Matrix Spike And Matrix Spike Duplicate <br />Lab Name: Paragon Analytics <br />Work Order Number: 0608220 <br />Client Name: CEMEX, Inc. <br />ClientProject ID: A and c Pit <br />~""T7T~#' ~;~ '"" ~~~`" ~" ~- Sample Matrix:WATER <br />Fis'! ID. A-PIT SE & TL Prep Batch:IP060908-22 Sample Aliquok 50 m1 <br />°/,Moisture: N/A <br />~- , -"~. ~. - <br />~, LabID=0608220-2M5 <br />I <br />OCBatchID: IP060908-22-1 <br />Final Volume: <br />50 m1 <br />, <br />Date Collected:28-Aug-O6 Run lD:im060908-1 a2 Resuk Unks: ug/I <br />Date Extracted:08-Sep-O6 Cleanup: NONE File Name: 08SEPO6A <br />Date Analyzed:OS-Sep-O6 Basis: As Received <br />Prep Method: EPA20D.2 Rev 2.8 <br /> <br />CASNO Target Analyte Sample Samp MS MS Reporting Spike MS % Control <br /> Result Qual Result dual Limit Added Rec. Limits <br />7782-49-2 SELENIUM 3.7 46.9 1 40 108 70 - 130% <br />7440-28-0 THALLIUM 0.2 U 1.29 0.2 1 129 70-130% <br /> <br />t '""~~"~"'~' Sample Matrix:WATER Prep Batch: IPOfi0908-22 Sample Aliquot: 50 m1 <br />Freld ID r A-PIT SE & TL <br />Moisture: N/A <br />06 <br />2MSD <br />1 QCBatchID:IP060908-22-1 Final Volume: SO mI <br />~-=-Lali <br />D;; <br />08220- <br />Date Collected:28-Aug-O6 Run ID: im060908-1 a2 Resuk Units: ugA <br />Date Extracted:06-Sep-O6 Cleanup: NONE File Name: OBSEPO6A <br />Date Analyzed:08-Sep-O6 Basis: As Received <br />Prep Method: EPA200.2 Rev 2.8 <br /> <br />CASNO Target Analyte MSD MSD Spike MSD °!° Reporting RPD RPD <br />Result Qual Added Rec. Limit Limit <br />7782-49-2 SELENIUM 47-6 40 110 1 20 1 <br />7440.28-0 THALLIUM 1,28 1 128 0.2 20 1 <br /> <br />Data PackagelD:im0608220-1 <br />Date Pdnted:Tuesday, September 12, 2006 Paragon Analytics Page 1 of 1 <br />LIMA Versi°n: 5.422A <br />10 <br />