My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54613
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:40 PM
Creation date
11/20/2007 4:14:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
DESIGN AND CONSTUCTION SPECIFICATIONS FOR HAULROADS
Section_Exhibit Name
APPENDIX S
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TRAPPER M~IING INC. <br />CRAIG, COLORADO <br />STATEMENT OF COMPLIANCE <br />ACCESS ROADS <br />I, James M. Holism, do state that the existing access roads listed on the attached Table S-1 and shown <br />on Map M-52 were constmcted before August 1, 1995. Construction methods were sufficient to <br />accommodate the anticipated volume of traffic and weight aad speed of the vehicles to be used. All <br />listed access roads shall not cause additional co~ributions of suspended solids to runoff outside the <br />permit area as mnoff is muted through one or more sediment control stroctures. The access roads have <br />beep located to mieim;~r. downstream sedimentation and flooding. <br />Overall grades do not exceed lOH:1V. No pitch grade exceeds 6.SH:1V for any consecutive 1000 fect <br />and pitch grades exceeding 15% (6.SH:1V) are not longer than 300 feet within any consecutive 1000 <br />feet. Horizontal and vertical alignments are coordinated to ensure that the road will not cause <br />environmental damage. <br />Topsoil has been removed from the roadbed, shoulders and areas where associated stmctures have been <br />placed. Each access road has been constructed and maintained to provide adegrrate drainage. Water <br />• co~rol systems will safely pass the peak nmoff from a 10 year, 24 hour event. <br />No acid or toxic forming substances have been used in the construction of access roads. Access roads <br />and appurtenant stmctures are maintained in such a manner as to prevent damage to adjacent resources. <br />Access roads shall be reclaimed in accordance with Rule 4.03.2. <br />~- <br />James M. Mattem <br />Engineeting Manager <br />C~ <br />MR-IS I <br />AP~KovED Ir~z2~96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.