Laserfiche WebLink
~ ~~ <br />Topsoil has been removed from the site and is temporarily <br />stockpiled in a windrow at the lower (east) end of the <br />disturbance area. Much of this topsoil will. be used for <br />reclamation of the shaft site this fall. The portion to tie <br />placed in long,-term storage will be taken approximately 0.2 <br />mile PIE, as shown on the accompanying map. The purpose of <br />placing the topsoil at this location is to he able to construct <br />the pile on fairly level ground protecting it from erosion. <br />If you have any questions on this matter, please fee]. free <br />to contact me. <br />Sincerely, <br />~ ,l ~'~ ~ _ <br />,~ <br />David Y!. 7.eeh, P.E. <br />Mining Engineer <br />DWZ/as <br />AfpLIa <br />Attachment <br />C <br />u <br />L ~ti ~ <br />-- ~~ ~~A~ <br />