Laserfiche WebLink
• The outslope of the fill is graded at approximately 2.5:1 with 20-foot benches constructed every <br />40 feet in elevation. At reclamation, the outslopes and top of the fill are covered with topsoil or <br />suitable material after rough grading takes place. The outslopes are walked with a dozer to <br />minimize erosion prior to seeding. Appropriately armored diversion ditches are installed on each <br />side of the fill to carry runoff to a sediment control structure. The top of the fill and the benches <br />are graded to direct runoff to these perimeter collection ditches. ~.~i / <br />Spoil Transportation Zones ~Q ~ Gyre h-o J , <br />Spoil transportation zones are eas adjacent to the fills and below the coal seams mined. They <br />are shown on Map 2.05.3-1. Overburden may be transported over the areas by dozer or gravity <br />for final placement in the fill. Overburden will be transported only over these areas- no coal will <br />be recovered inside [he zones. After the overburden is transported over these zones, they will be <br />restored to their original contour. No material will be stored in these zones. Following <br />overburden removal and placement, the zones will be walked with a dozer to minimize erosion, <br />topsoil replaced, and seeded. The area covered by the zones is considered disturbed and treated <br />as such in sediment control and reclamation calculations. <br />• <br />I• <br />LnrencimPmc-PM'P(475)Dec2U02 wpd <br />2.05-11 (rEVised 10/S1/02) <br />