Laserfiche WebLink
<br />• <br />WATER INFORMATION <br />a. Operation will not directly affect surface or groundwater systems. <br />• b. N.A. <br />c. If the market demands that concrete aggregate be manufactured then <br />washing will be required. It is impossible to determine these <br />~ volumes at this time. We feel that a better estimate of volumes <br />can be determined when the first annual report is submitted. <br />d, See page S of the Lease Agreement <br />• <br /> <br /> <br /> <br /> <br />C7 <br /> <br />n <br />~. <br />• <br />e. N.A. <br />f. N.A. <br /> <br />