Laserfiche WebLink
The monitoring requirements for the Streeter Fill were included in <br />• the Permit as Stipulations and are as follows: <br />STIPULATION No. 6 <br />"The Permittee will monitor water levels in the monitoring <br />wells existing within the Streeter Canyon Fill, including the <br />two wells designated as MW-1 and MW-2, installed on the 6900 <br />foot elevation terrace bench, and the one well designated as <br />MW-3, installed adjacent to the toe of the fill at the 6600 <br />foot elevation. The Permittee will further install additional <br />pairs of survey monuments at the 7000, 7100, 7200 and 7300 <br />foot elevations on the Streeter Canyon Fill, as the fill <br />reaches completion at those elevations. The Permittee will <br />submit proposed monument locations to the Division for <br />approval prior to installation of the survey monuments. <br />Monitoring of the wells and surveying of the monuments shall <br />both be accomplished quarterly. The Division will be informed <br />immediately if any hazardous condition is determined to exist <br />within the Streeter Canyon Fill. The Permittee will continue <br />this monitoring program until the Division approves cessation <br />• in writing." <br />STIPULATION NO. 7 <br />"The Permittee will accomplish inspections of the Streeter <br />Canyon Fill and submit Certified Inspection Reports to the <br />Division in accordance with the requirements of the plan <br />designed in accordance with Rule 2.06. These inspections and <br />Certified Inspection Reports will include specific examination <br />and discussion of the facial conditions of the fill, in order <br />to determine whether the development of perched water tables <br />within the fill is affecting its surficial slope stability. <br />Further, if the required engineering inspections determine <br />that surficial slope failure conditions are imminent, or if <br />surficial slope failure manifests itself within Streeter <br />Canyon Fill, the Permittee will prepare and submit to the <br />Division detailed engineering plans to abate any imminent or <br />manifested slope stability problem. Any appropriate remedial <br />activity shall commence immediately following the approval of <br />the detailed engineering plans by the Division." <br /> <br />2.06-2 <br />