Laserfiche WebLink
stockpiling of topsoil in compliance with 4.21.4(5). If necessary, please provide <br />description and commitment to strip and stockpile topsoil during the period of activity. <br />d. The statement is made that air rotary drilling will be the preferred technique but an <br />option is left for use of water or mud. Please provide a description of actions that will be <br />taken on the drillpad area if water is used. <br />e. Pursuant to the statement that no earth moving is anticipated, please provide site - <br />specific details to indicate that access can be made to drill sites across the proposed spur <br />roads without damage to the land surface or topsoil resource regardless of weather <br />conditions. If necessary, please provide description and commitment to strip and <br />stockpile topsoil during the period of activity. <br />f. If the road spurs are to be retained after the project is completed, please provide a letter <br />requesting their retention from the appropriate land owner. <br />If you have any questions, please call me at 303 -866 -4928. <br />Sincerely, <br />Jim Burnell <br />Environmental Protection Specialist <br />Cc: S. Brown; K. Gorham <br />